Effects of a Delayed Expansion of Interconnector Capacities in a High RES-E European Electricity System - Dataset

Input and output data of the modelling work for the paper Effects of a Delayed Expansion of Interconnector Capacities in a High RES-E European Electricity System Considered scenario years: 2030, 2040 and 2050 The profiles are based on the historical year 2016. Two scenarios are included: lower conne...

Full description

Bibliographic Details
Main Author: Ritter, David
Format: Dataset
Language:English
Published: 2019
Subjects:
Online Access:https://zenodo.org/record/3257495
https://doi.org/10.5281/zenodo.3257495
Description
Summary:Input and output data of the modelling work for the paper Effects of a Delayed Expansion of Interconnector Capacities in a High RES-E European Electricity System Considered scenario years: 2030, 2040 and 2050 The profiles are based on the historical year 2016. Two scenarios are included: lower connectivity and high connectivity The data cover the ENTSO-E member countries except Iceland and Cyprus and is given in country-specific resolution. Input: Demand as hourly profile in MWh Variable RES-E as hourly profile in MWh Power plant fleet as capacities in MW NTCs as capacities in MW Output: CO2 emissions as annual data in Mt Variable electricity generation costs as annual data in MEur Variable electricity generation costs per generation as annual data in Euro/MWh Electricity generation as annual data in TWh Electricity export as annual data in TWh Electricity import as annual data in TWh Transit flows as annual data in TWh The sources are described in the corresponding paper under the following link: https://www.mdpi.com/1996-1073/12/16/3098