Stress absorbing membrane innerlayer : final report.

The westbound lanes of the South Baker Interchange-Encina Interchange Section of I-84 were overlayed in 1977. A stress absorbing membrane innerlayer (SAMI), was included in this overlay as an experimental feature. This report is the final evaluation of the SAMI. Although the pavement did not perform...

Full description

Bibliographic Details
Main Authors: Hardy, Thomas A., Brock, Leon G., Beecroft, Gordon, Oregon State Highway Division. Research Section
Other Authors: United States. Federal Highway Administration
Format: Other/Unknown Material
Language:English
Published: Oregon State Highway Division. Research Section
Subjects:
Online Access:https://rosap.ntl.bts.gov/view/dot/22491