Feasibility determination of hydroelectric power development at the existing Sewall's Falls Dam and power facilities for the New Hampshire Water Resources Board

The feasibility of restoring the hydroelectric power generating capacity of the Sewall's Falls facility near Concord, NH was evaluated considering technical, economic, safety and environmental factors. It was concluded that electric power can be generated at the proposed facility at a cost of $...

Full description

Bibliographic Details
Main Author: Not Available
Language:unknown
Published: 2015
Subjects:
USA
Online Access:http://www.osti.gov/servlets/purl/5858520
https://www.osti.gov/biblio/5858520
https://doi.org/10.2172/5858520
Description
Summary:The feasibility of restoring the hydroelectric power generating capacity of the Sewall's Falls facility near Concord, NH was evaluated considering technical, economic, safety and environmental factors. It was concluded that electric power can be generated at the proposed facility at a cost of $0.025 to $0.029 per kWh, and that the construction and operation of the facility is feasible. (LCL)