Feasibility determination of hydroelectric power development at the existing Sewall's Falls Dam and power facilities for the New Hampshire Water Resources Board
The feasibility of restoring the hydroelectric power generating capacity of the Sewall's Falls facility near Concord, NH was evaluated considering technical, economic, safety and environmental factors. It was concluded that electric power can be generated at the proposed facility at a cost of $...
Main Author: | |
---|---|
Language: | unknown |
Published: |
2015
|
Subjects: | |
Online Access: | http://www.osti.gov/servlets/purl/5858520 https://www.osti.gov/biblio/5858520 https://doi.org/10.2172/5858520 |
Summary: | The feasibility of restoring the hydroelectric power generating capacity of the Sewall's Falls facility near Concord, NH was evaluated considering technical, economic, safety and environmental factors. It was concluded that electric power can be generated at the proposed facility at a cost of $0.025 to $0.029 per kWh, and that the construction and operation of the facility is feasible. (LCL) |
---|