Utveckling av handhållen pump för reumatiker

This report is the result of a Thesis project at the Master Programme in Industrial Design Engineering at Luleå University of Technology (LTU). The project took place between Januari and August 2012 and the goal is to develop a new kind of hand held pump for people with rheumatism. The project is in...

Full description

Bibliographic Details
Main Authors: Palmqvist, Johan, Pettersson, Henrik
Format: Bachelor Thesis
Language:Swedish
Published: 2012
Subjects:
Online Access:http://urn.kb.se/resolve?urn=urn:nbn:se:ltu:diva-55677
Description
Summary:This report is the result of a Thesis project at the Master Programme in Industrial Design Engineering at Luleå University of Technology (LTU). The project took place between Januari and August 2012 and the goal is to develop a new kind of hand held pump for people with rheumatism. The project is initiated by Fredrik Martinsson, a client based in Mölndal, but the work is done at LTU. The purpose is to develop a new user friendly product to make it easier for people with lowered functionality in their hands to inflate car- and bicycle tires. Existing pumps are based on outdated technology and contain a lot of cumbersome steps during use. The client’s requirements focus on a user friendly product and quick usage which excludes the possibility of a completely manual pump. To meet the specific demands the development work aims to design a portable product that is easy to carry with a propulsion method fast enough to inflate a tire in a matter of seconds. Limitations during the project is an additional market analysis, regarding market potential, other than the one received from the client. It will therefore be assumed that there is an existing need for the product and that the primary users are people with rheumatism and also people who seek a user friendly and fast pump. The overall goal is a fully functional prototype. Package design and marketing material will not be considered. The project started out with conventional methods for project management and a project plan, time plan and included acitivies were discussed with the client. A product development process consisting of four different phases with dedicated deliverables was created. The first phase consists of convergent data collection with user studies, interviews and benchmarking. A problem statement and requirements list were made and lay the foundation for the second creative ideation phase. The quantitative amount of ideas generated were evaluated with numerous methods and a set of concepts were created for further development. The concepts were then ...