Demolition of a 65-year-old box-girder prestressed concrete bridge located in Northern Sweden
A new bridge was built in Kalix, northern Sweden, to replace an existing prestressed concrete box-girder bridge that had been in service for over 60 years. The old bridge had a total length of 283.6 m divided into five spans: 43.9 m, 47.0 m, 94.0 m, 47.0 m, and 43.9 m. It was constructed using the b...
Published in: | ce/papers |
---|---|
Main Authors: | , , , , |
Format: | Conference Object |
Language: | English |
Published: |
Luleå tekniska universitet, Byggkonstruktion och brand
2023
|
Subjects: | |
Online Access: | http://urn.kb.se/resolve?urn=urn:nbn:se:ltu:diva-103664 https://doi.org/10.1002/cepa.2745 |
_version_ | 1821663336135131136 |
---|---|
author | Daescu, Cosmin Al Gonzalez-Libreros, Jaime Wang, Chao Elfgren, Lennart Sas, Gabriel |
author_facet | Daescu, Cosmin Al Gonzalez-Libreros, Jaime Wang, Chao Elfgren, Lennart Sas, Gabriel |
author_sort | Daescu, Cosmin Al |
collection | Luleå University of Technology Publications (DiVA) |
container_issue | 5 |
container_start_page | 229 |
container_title | ce/papers |
container_volume | 6 |
description | A new bridge was built in Kalix, northern Sweden, to replace an existing prestressed concrete box-girder bridge that had been in service for over 60 years. The old bridge had a total length of 283.6 m divided into five spans: 43.9 m, 47.0 m, 94.0 m, 47.0 m, and 43.9 m. It was constructed using the balanced cantilever method with segments having lengths of around 3.0 m. The need for replacement arose from recommendations extracted from an assessment of the old bridge's state and capacity. In addition to the construction of the new bridge, its replacement necessitated the creation and evaluation of demolition procedure for the existing bridge. This procedure had to be carefully designed to avoid damaging the new bridge and stability-related issues but also to prevent debris from falling into the Kalix River, which is part of a Natura 2000 protected area. This paper discusses various issues considered while developing the demolition strategy, including the use of bed-rock anchored tendons, intermediate support fixing at specific locations, and proper evaluation of position of the demolition equipment supported by the bridge, among others. The problem of disposing of the demolished material is also discussed. Funder: NCC Infrastructure, Civil Engineering Division, Sweden; Full text license: CC BY |
format | Conference Object |
genre | Northern Sweden |
genre_facet | Northern Sweden |
geographic | Kalix |
geographic_facet | Kalix |
id | ftluleatu:oai:DiVA.org:ltu-103664 |
institution | Open Polar |
language | English |
long_lat | ENVELOPE(23.156,23.156,65.853,65.853) |
op_collection_id | ftluleatu |
op_container_end_page | 234 |
op_doi | https://doi.org/10.1002/cepa.2745 |
op_relation | ce/papers - Proceedings in Civil Engineering 6:5 EuroStruct 2023 European Association on Quality Control of Bridges and Structures: Digital Transformation in Sustainability, p. 229-234 doi:10.1002/cepa.2745 ISI:001256546000084 |
op_rights | info:eu-repo/semantics/openAccess |
publishDate | 2023 |
publisher | Luleå tekniska universitet, Byggkonstruktion och brand |
record_format | openpolar |
spelling | ftluleatu:oai:DiVA.org:ltu-103664 2025-01-16T23:55:03+00:00 Demolition of a 65-year-old box-girder prestressed concrete bridge located in Northern Sweden Daescu, Cosmin Al Gonzalez-Libreros, Jaime Wang, Chao Elfgren, Lennart Sas, Gabriel 2023 application/pdf http://urn.kb.se/resolve?urn=urn:nbn:se:ltu:diva-103664 https://doi.org/10.1002/cepa.2745 eng eng Luleå tekniska universitet, Byggkonstruktion och brand Politehnica University Timisoara, Timisoara, Romania ce/papers - Proceedings in Civil Engineering 6:5 EuroStruct 2023 European Association on Quality Control of Bridges and Structures: Digital Transformation in Sustainability, p. 229-234 doi:10.1002/cepa.2745 ISI:001256546000084 info:eu-repo/semantics/openAccess Bridge Demolition Waste Disposal Deconstruction Tendons Anchoring System Infrastructure Engineering Infrastrukturteknik Conference paper info:eu-repo/semantics/conferenceObject text 2023 ftluleatu https://doi.org/10.1002/cepa.2745 2024-12-18T12:24:47Z A new bridge was built in Kalix, northern Sweden, to replace an existing prestressed concrete box-girder bridge that had been in service for over 60 years. The old bridge had a total length of 283.6 m divided into five spans: 43.9 m, 47.0 m, 94.0 m, 47.0 m, and 43.9 m. It was constructed using the balanced cantilever method with segments having lengths of around 3.0 m. The need for replacement arose from recommendations extracted from an assessment of the old bridge's state and capacity. In addition to the construction of the new bridge, its replacement necessitated the creation and evaluation of demolition procedure for the existing bridge. This procedure had to be carefully designed to avoid damaging the new bridge and stability-related issues but also to prevent debris from falling into the Kalix River, which is part of a Natura 2000 protected area. This paper discusses various issues considered while developing the demolition strategy, including the use of bed-rock anchored tendons, intermediate support fixing at specific locations, and proper evaluation of position of the demolition equipment supported by the bridge, among others. The problem of disposing of the demolished material is also discussed. Funder: NCC Infrastructure, Civil Engineering Division, Sweden; Full text license: CC BY Conference Object Northern Sweden Luleå University of Technology Publications (DiVA) Kalix ENVELOPE(23.156,23.156,65.853,65.853) ce/papers 6 5 229 234 |
spellingShingle | Bridge Demolition Waste Disposal Deconstruction Tendons Anchoring System Infrastructure Engineering Infrastrukturteknik Daescu, Cosmin Al Gonzalez-Libreros, Jaime Wang, Chao Elfgren, Lennart Sas, Gabriel Demolition of a 65-year-old box-girder prestressed concrete bridge located in Northern Sweden |
title | Demolition of a 65-year-old box-girder prestressed concrete bridge located in Northern Sweden |
title_full | Demolition of a 65-year-old box-girder prestressed concrete bridge located in Northern Sweden |
title_fullStr | Demolition of a 65-year-old box-girder prestressed concrete bridge located in Northern Sweden |
title_full_unstemmed | Demolition of a 65-year-old box-girder prestressed concrete bridge located in Northern Sweden |
title_short | Demolition of a 65-year-old box-girder prestressed concrete bridge located in Northern Sweden |
title_sort | demolition of a 65-year-old box-girder prestressed concrete bridge located in northern sweden |
topic | Bridge Demolition Waste Disposal Deconstruction Tendons Anchoring System Infrastructure Engineering Infrastrukturteknik |
topic_facet | Bridge Demolition Waste Disposal Deconstruction Tendons Anchoring System Infrastructure Engineering Infrastrukturteknik |
url | http://urn.kb.se/resolve?urn=urn:nbn:se:ltu:diva-103664 https://doi.org/10.1002/cepa.2745 |