Summary: | This paper presents an appraisal study of three different airport proposals in Greenland by the use of an adapted version of the Danish CBA-DK model. The assessment model is based on both a deterministic calculation by the use of conventional cost-benefit analysis and a stochastic calculation, where risk analysis is carried out using Monte Carlo simulation. The feasibility risk adopted in the model is based on assigning probability distributions to the uncer-tain model parameters. Two probability distributions are presented, the Erlang and normal distribution respectively assigned to the construction cost and the travel time sav-ings. The obtained model results aim to provide an input to informed decision-making based on an account of the level of desired risk as concerns feasibility risks. This level is presented as the probability of obtaining at least a benefit-cost ratio of a specified value. Finally, some conclusions and a perspective are presented.
|