A major construction effort is needed at Dew Line Ice Cap Station DYE-2 to extend its useful life to 1986. That work should be done as soon as possible because the truss enclosure is deteriorating rapidly. Although a 210-ft sideways move as was accomplished at DYE-3 in 1977 is technically feasible,...
Main Authors: | , |
---|---|
Other Authors: | |
Format: | Text |
Language: | English |
Published: |
1980
|
Subjects: | |
Online Access: | http://www.dtic.mil/docs/citations/ADA084278 http://oai.dtic.mil/oai/oai?&verb=getRecord&metadataPrefix=html&identifier=ADA084278 |
Summary: | A major construction effort is needed at Dew Line Ice Cap Station DYE-2 to extend its useful life to 1986. That work should be done as soon as possible because the truss enclosure is deteriorating rapidly. Although a 210-ft sideways move as was accomplished at DYE-3 in 1977 is technically feasible, the alternative of backfilling the truss enclosure with ice is expected to cost about $2.7 million less. Unless there is a strong possibility that DYE-2 will be needed for many years beyond 1986, the ice backfill alternative is recommended. See also Part 1, ADA074733. |
---|