Experimental Crack Sealing in Asphaltic Concrete Pavements. Thule Air Base. Greenland, 8-24 August 1960
The primary purpose of the experimental crack sealing discussed herein was to determine the performance of various sealing compounds under severe arctic conditions. It was also desired to determine the effects of variations in width, depth, and shape of cut when preparing the cracks for sealing, and...
Other Authors: | |
---|---|
Format: | Text |
Language: | English |
Published: |
1961
|
Subjects: | |
Online Access: | http://www.dtic.mil/docs/citations/ADA081138 http://oai.dtic.mil/oai/oai?&verb=getRecord&metadataPrefix=html&identifier=ADA081138 |
Summary: | The primary purpose of the experimental crack sealing discussed herein was to determine the performance of various sealing compounds under severe arctic conditions. It was also desired to determine the effects of variations in width, depth, and shape of cut when preparing the cracks for sealing, and also the difficulties and approximate costs involved. |
---|