An Investigation of Ice Clogged Channels in the St. Marys River.
This study addresses itself to the problem of removing brash ice from Frechette Point to Six-Mile Point of the Little Rapids Cut of the St. Marys River system. The area and river system are described and estimates are made for partially clearing a channel 250 ft wide. Rough costs, based on dollars p...
Main Authors: | , , , |
---|---|
Other Authors: | |
Format: | Text |
Language: | English |
Published: |
1978
|
Subjects: | |
Online Access: | http://www.dtic.mil/docs/citations/ADA058015 http://oai.dtic.mil/oai/oai?&verb=getRecord&metadataPrefix=html&identifier=ADA058015 |
id |
ftdtic:ADA058015 |
---|---|
record_format |
openpolar |
spelling |
ftdtic:ADA058015 2023-05-15T16:36:58+02:00 An Investigation of Ice Clogged Channels in the St. Marys River. Mellor,Malcolm Vance,George P Wuebben,James L Frankenstein,Guenther E COLD REGIONS RESEARCH AND ENGINEERING LAB HANOVER N H 1978-03 text/html http://www.dtic.mil/docs/citations/ADA058015 http://oai.dtic.mil/oai/oai?&verb=getRecord&metadataPrefix=html&identifier=ADA058015 en eng http://www.dtic.mil/docs/citations/ADA058015 APPROVED FOR PUBLIC RELEASE DTIC AND NTIS Hydrology Limnology and Potamology Snow Ice and Permafrost *RIVERS *WATER TRAFFIC *ICE BREAKUP COST ANALYSIS COLD WEATHER OPERATIONS ICE FORMATION WINTER NAVIGATION CHANNELS(WATERWAYS) SHIPPING MICHIGAN LAKE SUPERIOR *Saint Marys River Text 1978 ftdtic 2016-02-20T13:35:08Z This study addresses itself to the problem of removing brash ice from Frechette Point to Six-Mile Point of the Little Rapids Cut of the St. Marys River system. The area and river system are described and estimates are made for partially clearing a channel 250 ft wide. Rough costs, based on dollars per horsepower, indicate that it would cost between 1 and 2 million dollars per clear channel mile per year. (Author) Text Ice permafrost Defense Technical Information Center: DTIC Technical Reports database Little Rapids ENVELOPE(-111.185,-111.185,58.917,58.917) St. Marys River ENVELOPE(-55.839,-55.839,52.312,52.312) |
institution |
Open Polar |
collection |
Defense Technical Information Center: DTIC Technical Reports database |
op_collection_id |
ftdtic |
language |
English |
topic |
Hydrology Limnology and Potamology Snow Ice and Permafrost *RIVERS *WATER TRAFFIC *ICE BREAKUP COST ANALYSIS COLD WEATHER OPERATIONS ICE FORMATION WINTER NAVIGATION CHANNELS(WATERWAYS) SHIPPING MICHIGAN LAKE SUPERIOR *Saint Marys River |
spellingShingle |
Hydrology Limnology and Potamology Snow Ice and Permafrost *RIVERS *WATER TRAFFIC *ICE BREAKUP COST ANALYSIS COLD WEATHER OPERATIONS ICE FORMATION WINTER NAVIGATION CHANNELS(WATERWAYS) SHIPPING MICHIGAN LAKE SUPERIOR *Saint Marys River Mellor,Malcolm Vance,George P Wuebben,James L Frankenstein,Guenther E An Investigation of Ice Clogged Channels in the St. Marys River. |
topic_facet |
Hydrology Limnology and Potamology Snow Ice and Permafrost *RIVERS *WATER TRAFFIC *ICE BREAKUP COST ANALYSIS COLD WEATHER OPERATIONS ICE FORMATION WINTER NAVIGATION CHANNELS(WATERWAYS) SHIPPING MICHIGAN LAKE SUPERIOR *Saint Marys River |
description |
This study addresses itself to the problem of removing brash ice from Frechette Point to Six-Mile Point of the Little Rapids Cut of the St. Marys River system. The area and river system are described and estimates are made for partially clearing a channel 250 ft wide. Rough costs, based on dollars per horsepower, indicate that it would cost between 1 and 2 million dollars per clear channel mile per year. (Author) |
author2 |
COLD REGIONS RESEARCH AND ENGINEERING LAB HANOVER N H |
format |
Text |
author |
Mellor,Malcolm Vance,George P Wuebben,James L Frankenstein,Guenther E |
author_facet |
Mellor,Malcolm Vance,George P Wuebben,James L Frankenstein,Guenther E |
author_sort |
Mellor,Malcolm |
title |
An Investigation of Ice Clogged Channels in the St. Marys River. |
title_short |
An Investigation of Ice Clogged Channels in the St. Marys River. |
title_full |
An Investigation of Ice Clogged Channels in the St. Marys River. |
title_fullStr |
An Investigation of Ice Clogged Channels in the St. Marys River. |
title_full_unstemmed |
An Investigation of Ice Clogged Channels in the St. Marys River. |
title_sort |
investigation of ice clogged channels in the st. marys river. |
publishDate |
1978 |
url |
http://www.dtic.mil/docs/citations/ADA058015 http://oai.dtic.mil/oai/oai?&verb=getRecord&metadataPrefix=html&identifier=ADA058015 |
long_lat |
ENVELOPE(-111.185,-111.185,58.917,58.917) ENVELOPE(-55.839,-55.839,52.312,52.312) |
geographic |
Little Rapids St. Marys River |
geographic_facet |
Little Rapids St. Marys River |
genre |
Ice permafrost |
genre_facet |
Ice permafrost |
op_source |
DTIC AND NTIS |
op_relation |
http://www.dtic.mil/docs/citations/ADA058015 |
op_rights |
APPROVED FOR PUBLIC RELEASE |
_version_ |
1766027289482493952 |