An Investigation of Ice Clogged Channels in the St. Marys River.

This study addresses itself to the problem of removing brash ice from Frechette Point to Six-Mile Point of the Little Rapids Cut of the St. Marys River system. The area and river system are described and estimates are made for partially clearing a channel 250 ft wide. Rough costs, based on dollars p...

Full description

Bibliographic Details
Main Authors: Mellor,Malcolm, Vance,George P, Wuebben,James L, Frankenstein,Guenther E
Other Authors: COLD REGIONS RESEARCH AND ENGINEERING LAB HANOVER N H
Format: Text
Language:English
Published: 1978
Subjects:
Ice
Online Access:http://www.dtic.mil/docs/citations/ADA058015
http://oai.dtic.mil/oai/oai?&verb=getRecord&metadataPrefix=html&identifier=ADA058015
Description
Summary:This study addresses itself to the problem of removing brash ice from Frechette Point to Six-Mile Point of the Little Rapids Cut of the St. Marys River system. The area and river system are described and estimates are made for partially clearing a channel 250 ft wide. Rough costs, based on dollars per horsepower, indicate that it would cost between 1 and 2 million dollars per clear channel mile per year. (Author)