Observations Along the Pipeline Haul Road Between Livengood and the Yukon River.
Periodic observations over a six-year period along the TAPS Road have been evaluated with respect to construction and slope stabilization techniques in ice-rich roadway cuts and embankment subgrades. Lateral drainage ditches of sufficient width to handle construction excavation equipment, along with...
Main Authors: | , |
---|---|
Other Authors: | |
Format: | Text |
Language: | English |
Published: |
1976
|
Subjects: | |
Online Access: | http://www.dtic.mil/docs/citations/ADA033380 http://oai.dtic.mil/oai/oai?&verb=getRecord&metadataPrefix=html&identifier=ADA033380 |
Summary: | Periodic observations over a six-year period along the TAPS Road have been evaluated with respect to construction and slope stabilization techniques in ice-rich roadway cuts and embankment subgrades. Lateral drainage ditches of sufficient width to handle construction excavation equipment, along with near-vertical slope cuts with hand-cleared tops equal in width to one and one-half times the height of the cuts, significantly enhance natural processes of slope stabilization. Right-of-way clearing limited to the toe of embankment fill slopes minimizes subsidence of the roadway and its shoulder slopes. In extremely ice-rich soil cuts, the seeding of the slopes should not be attempted until late in the first thaw season for best results. Natural woody growth can be expected to have a substantial stabilizing effect after five or six thaw seasons but could be accomplished sooner by planting tree seedlings. Attempts to stabilize ice-rich cut slopes with applications of insulation are not very effective and seem to prolong the natural stabilization process. (Author) |
---|