Check Test of Power Unit (PU-625) Under Arctic Winter Conditions.
A check test of the Power Unit (PU-625) was conducted by the Arctic Test Center under arctic winter conditions at Fort Greely, AK. Operational testing was performed in temperatures ranging from 0 to -59 F. Preoperational inspection, personnel training, functional adequacy, maintenance evaluation, sa...
Main Author: | |
---|---|
Other Authors: | |
Format: | Text |
Language: | English |
Published: |
1974
|
Subjects: | |
Online Access: | http://www.dtic.mil/docs/citations/AD0919249 http://oai.dtic.mil/oai/oai?&verb=getRecord&metadataPrefix=html&identifier=AD0919249 |
Summary: | A check test of the Power Unit (PU-625) was conducted by the Arctic Test Center under arctic winter conditions at Fort Greely, AK. Operational testing was performed in temperatures ranging from 0 to -59 F. Preoperational inspection, personnel training, functional adequacy, maintenance evaluation, safety, human factor engineering, and value engineering subtests were conducted. The purpose of the test was to determine if a previously reported deficiency had been corrected and that no new deficiencies were introduced by modifications. It was concluded that the PU-625 started as required in temperatures down to -59 F and that the previous deficiency had been corrected. |
---|