CONTROLLING ROAD ICING IN KRASNOYARSK REGION

Many icing areas have been registered on the newly built roads in the region. It has been found that open flumes for water runoff should be made from good heat-insulated materials and rectangular shaped flumes provide best performance. (Author) Trans. of Borba s Naledami na Zheleznykh i Avtomobilnyk...

Full description

Bibliographic Details
Main Author: Obraztsov,N. P.
Other Authors: ARMY FOREIGN SCIENCE AND TECHNOLOGY CENTER WASHINGTON D C
Format: Text
Language:English
Published: 1969
Subjects:
Ice
Online Access:http://www.dtic.mil/docs/citations/AD0691546
http://oai.dtic.mil/oai/oai?&verb=getRecord&metadataPrefix=html&identifier=AD0691546
Description
Summary:Many icing areas have been registered on the newly built roads in the region. It has been found that open flumes for water runoff should be made from good heat-insulated materials and rectangular shaped flumes provide best performance. (Author) Trans. of Borba s Naledami na Zheleznykh i Avtomobilnykh Dorogakh (USSR) n7 p17-23 1966.