CONSTRUCTION PROBLEMS WITH PILOT SANITARY SYSTEM AT POINT BARROW
A pilot sanitary system was designed to serve five family quarters buildings at the Arctic Research Laboratory at Point Barrow, but con struction problems and system failures have thus far prevented use of the system. The design in cluded sea water intakes, a distillation unit and distilled water di...
Main Author: | |
---|---|
Other Authors: | |
Format: | Text |
Language: | English |
Published: |
1963
|
Subjects: | |
Online Access: | http://www.dtic.mil/docs/citations/AD0412428 http://oai.dtic.mil/oai/oai?&verb=getRecord&metadataPrefix=html&identifier=AD0412428 |
id |
ftdtic:AD0412428 |
---|---|
record_format |
openpolar |
spelling |
ftdtic:AD0412428 2023-05-15T14:57:33+02:00 CONSTRUCTION PROBLEMS WITH PILOT SANITARY SYSTEM AT POINT BARROW Nehlsen,W.R. NAVAL CIVIL ENGINEERING LAB PORT HUENEME CALIF 1963-06-24 text/html http://www.dtic.mil/docs/citations/AD0412428 http://oai.dtic.mil/oai/oai?&verb=getRecord&metadataPrefix=html&identifier=AD0412428 en eng http://www.dtic.mil/docs/citations/AD0412428 Document partially illegible. DTIC AND NTIS CONSTRUCTION SEWAGE OCEANS DRAINAGE HEATING Text 1963 ftdtic 2016-02-22T00:17:40Z A pilot sanitary system was designed to serve five family quarters buildings at the Arctic Research Laboratory at Point Barrow, but con struction problems and system failures have thus far prevented use of the system. The design in cluded sea water intakes, a distillation unit and distilled water distribution system, and a sea water sanitary sewer system. Problems en countered include insulation failures caused by ground water, pipe breakage resulting02 faulty joints and heating wires, and pipe freezing. (Author) Text Arctic Point Barrow Defense Technical Information Center: DTIC Technical Reports database Arctic |
institution |
Open Polar |
collection |
Defense Technical Information Center: DTIC Technical Reports database |
op_collection_id |
ftdtic |
language |
English |
topic |
CONSTRUCTION SEWAGE OCEANS DRAINAGE HEATING |
spellingShingle |
CONSTRUCTION SEWAGE OCEANS DRAINAGE HEATING Nehlsen,W.R. CONSTRUCTION PROBLEMS WITH PILOT SANITARY SYSTEM AT POINT BARROW |
topic_facet |
CONSTRUCTION SEWAGE OCEANS DRAINAGE HEATING |
description |
A pilot sanitary system was designed to serve five family quarters buildings at the Arctic Research Laboratory at Point Barrow, but con struction problems and system failures have thus far prevented use of the system. The design in cluded sea water intakes, a distillation unit and distilled water distribution system, and a sea water sanitary sewer system. Problems en countered include insulation failures caused by ground water, pipe breakage resulting02 faulty joints and heating wires, and pipe freezing. (Author) |
author2 |
NAVAL CIVIL ENGINEERING LAB PORT HUENEME CALIF |
format |
Text |
author |
Nehlsen,W.R. |
author_facet |
Nehlsen,W.R. |
author_sort |
Nehlsen,W.R. |
title |
CONSTRUCTION PROBLEMS WITH PILOT SANITARY SYSTEM AT POINT BARROW |
title_short |
CONSTRUCTION PROBLEMS WITH PILOT SANITARY SYSTEM AT POINT BARROW |
title_full |
CONSTRUCTION PROBLEMS WITH PILOT SANITARY SYSTEM AT POINT BARROW |
title_fullStr |
CONSTRUCTION PROBLEMS WITH PILOT SANITARY SYSTEM AT POINT BARROW |
title_full_unstemmed |
CONSTRUCTION PROBLEMS WITH PILOT SANITARY SYSTEM AT POINT BARROW |
title_sort |
construction problems with pilot sanitary system at point barrow |
publishDate |
1963 |
url |
http://www.dtic.mil/docs/citations/AD0412428 http://oai.dtic.mil/oai/oai?&verb=getRecord&metadataPrefix=html&identifier=AD0412428 |
geographic |
Arctic |
geographic_facet |
Arctic |
genre |
Arctic Point Barrow |
genre_facet |
Arctic Point Barrow |
op_source |
DTIC AND NTIS |
op_relation |
http://www.dtic.mil/docs/citations/AD0412428 |
op_rights |
Document partially illegible. |
_version_ |
1766329656982634496 |