CONSTRUCTION PROBLEMS WITH PILOT SANITARY SYSTEM AT POINT BARROW

A pilot sanitary system was designed to serve five family quarters buildings at the Arctic Research Laboratory at Point Barrow, but con struction problems and system failures have thus far prevented use of the system. The design in cluded sea water intakes, a distillation unit and distilled water di...

Full description

Bibliographic Details
Main Author: Nehlsen,W.R.
Other Authors: NAVAL CIVIL ENGINEERING LAB PORT HUENEME CALIF
Format: Text
Language:English
Published: 1963
Subjects:
Online Access:http://www.dtic.mil/docs/citations/AD0412428
http://oai.dtic.mil/oai/oai?&verb=getRecord&metadataPrefix=html&identifier=AD0412428
id ftdtic:AD0412428
record_format openpolar
spelling ftdtic:AD0412428 2023-05-15T14:57:33+02:00 CONSTRUCTION PROBLEMS WITH PILOT SANITARY SYSTEM AT POINT BARROW Nehlsen,W.R. NAVAL CIVIL ENGINEERING LAB PORT HUENEME CALIF 1963-06-24 text/html http://www.dtic.mil/docs/citations/AD0412428 http://oai.dtic.mil/oai/oai?&verb=getRecord&metadataPrefix=html&identifier=AD0412428 en eng http://www.dtic.mil/docs/citations/AD0412428 Document partially illegible. DTIC AND NTIS CONSTRUCTION SEWAGE OCEANS DRAINAGE HEATING Text 1963 ftdtic 2016-02-22T00:17:40Z A pilot sanitary system was designed to serve five family quarters buildings at the Arctic Research Laboratory at Point Barrow, but con struction problems and system failures have thus far prevented use of the system. The design in cluded sea water intakes, a distillation unit and distilled water distribution system, and a sea water sanitary sewer system. Problems en countered include insulation failures caused by ground water, pipe breakage resulting02 faulty joints and heating wires, and pipe freezing. (Author) Text Arctic Point Barrow Defense Technical Information Center: DTIC Technical Reports database Arctic
institution Open Polar
collection Defense Technical Information Center: DTIC Technical Reports database
op_collection_id ftdtic
language English
topic CONSTRUCTION
SEWAGE
OCEANS
DRAINAGE
HEATING
spellingShingle CONSTRUCTION
SEWAGE
OCEANS
DRAINAGE
HEATING
Nehlsen,W.R.
CONSTRUCTION PROBLEMS WITH PILOT SANITARY SYSTEM AT POINT BARROW
topic_facet CONSTRUCTION
SEWAGE
OCEANS
DRAINAGE
HEATING
description A pilot sanitary system was designed to serve five family quarters buildings at the Arctic Research Laboratory at Point Barrow, but con struction problems and system failures have thus far prevented use of the system. The design in cluded sea water intakes, a distillation unit and distilled water distribution system, and a sea water sanitary sewer system. Problems en countered include insulation failures caused by ground water, pipe breakage resulting02 faulty joints and heating wires, and pipe freezing. (Author)
author2 NAVAL CIVIL ENGINEERING LAB PORT HUENEME CALIF
format Text
author Nehlsen,W.R.
author_facet Nehlsen,W.R.
author_sort Nehlsen,W.R.
title CONSTRUCTION PROBLEMS WITH PILOT SANITARY SYSTEM AT POINT BARROW
title_short CONSTRUCTION PROBLEMS WITH PILOT SANITARY SYSTEM AT POINT BARROW
title_full CONSTRUCTION PROBLEMS WITH PILOT SANITARY SYSTEM AT POINT BARROW
title_fullStr CONSTRUCTION PROBLEMS WITH PILOT SANITARY SYSTEM AT POINT BARROW
title_full_unstemmed CONSTRUCTION PROBLEMS WITH PILOT SANITARY SYSTEM AT POINT BARROW
title_sort construction problems with pilot sanitary system at point barrow
publishDate 1963
url http://www.dtic.mil/docs/citations/AD0412428
http://oai.dtic.mil/oai/oai?&verb=getRecord&metadataPrefix=html&identifier=AD0412428
geographic Arctic
geographic_facet Arctic
genre Arctic
Point Barrow
genre_facet Arctic
Point Barrow
op_source DTIC AND NTIS
op_relation http://www.dtic.mil/docs/citations/AD0412428
op_rights Document partially illegible.
_version_ 1766329656982634496