CONSTRUCTION PROBLEMS WITH PILOT SANITARY SYSTEM AT POINT BARROW

A pilot sanitary system was designed to serve five family quarters buildings at the Arctic Research Laboratory at Point Barrow, but con struction problems and system failures have thus far prevented use of the system. The design in cluded sea water intakes, a distillation unit and distilled water di...

Full description

Bibliographic Details
Main Author: Nehlsen,W.R.
Other Authors: NAVAL CIVIL ENGINEERING LAB PORT HUENEME CALIF
Format: Text
Language:English
Published: 1963
Subjects:
Online Access:http://www.dtic.mil/docs/citations/AD0412428
http://oai.dtic.mil/oai/oai?&verb=getRecord&metadataPrefix=html&identifier=AD0412428
Description
Summary:A pilot sanitary system was designed to serve five family quarters buildings at the Arctic Research Laboratory at Point Barrow, but con struction problems and system failures have thus far prevented use of the system. The design in cluded sea water intakes, a distillation unit and distilled water distribution system, and a sea water sanitary sewer system. Problems en countered include insulation failures caused by ground water, pipe breakage resulting02 faulty joints and heating wires, and pipe freezing. (Author)