Field Survey on Bridges in Permafrost region of Qing-Tibet Plateau and its Inspiration on the New Project
In order to provide the technical support for the Qinghai-Tibet Highway bridge design, a field survey was carried out. The survey started from Golmud and ended in Lhasa, which was a 1183 kilometers route. A comprehensive analysis was made on the aspects of bridge type selection, scheme design, bridg...
Main Authors: | , , , |
---|---|
Format: | Text |
Language: | unknown |
Published: |
figshare
2020
|
Subjects: | |
Online Access: | https://dx.doi.org/10.6084/m9.figshare.11954505 https://figshare.com/articles/Field_Survey_on_Bridges_in_Permafrost_region_of_Qing-Tibet_Plateau_and_its_Inspiration_on_the_New_Project/11954505 |
Summary: | In order to provide the technical support for the Qinghai-Tibet Highway bridge design, a field survey was carried out. The survey started from Golmud and ended in Lhasa, which was a 1183 kilometers route. A comprehensive analysis was made on the aspects of bridge type selection, scheme design, bridge deterioration etc. Typical deteriorations such as pier crack, bridge transition segment un-uniform settlement were found. Considering the specific situation of Qinghai-Tibet Highway bridge design, practical solutions were proposed on these governing issues: pile design and configuration in permafrost region, superstructure selection, bridge transition segment design. |
---|