D5.6 Operations Validation Results
The Operation Validation Results document, describes how the final version of the EDEN ISS procedures have been obtained from the preliminary version delivered before the start of the EDEN ISS Antarctica mission. These last have been provided as both annex of the document D4.6 Operations Procedures...
Main Authors: | , |
---|---|
Format: | Report |
Language: | unknown |
Published: |
Zenodo
2019
|
Subjects: | |
Online Access: | https://dx.doi.org/10.5281/zenodo.3229928 https://zenodo.org/record/3229928 |
Summary: | The Operation Validation Results document, describes how the final version of the EDEN ISS procedures have been obtained from the preliminary version delivered before the start of the EDEN ISS Antarctica mission. These last have been provided as both annex of the document D4.6 Operations Procedures Test Report and as a standalone product for the EDEN ISS operators, accessible in electronic format on the computers used for the EDEN ISS operations. As stated in other documents, the EDEN ISS test campaign has been used, among other things, as final validation step of the procedures. During the operations, the Antarctica operator has collected several notes and comments to the procedures, underlining all the technical and/or sequence mistakes and/or discrepancies. His feedback has been used to finally upgrade/update the procedures, or even to develop new ones as per identified new need. This document describes the feedbacks provided by the Antarctica operator, and provides in annex the final version of the procedures (for those procedures whose inputs are available). Finally, those procedure that cannot be updated (because the inputs are not yet available) and are still in draft or preliminary status, will be tracked as open points, and provided in other annexes of this document. |
---|