Building Information Modeling And Its Application In The State Of Kuwait

Recent advances of Building Information Modeling (BIM) especially in the Middle East have increased remarkably. Dubai has been taking a lead on this by making it mandatory for BIM to be adopted for all projects that involve complex architecture designs. This is because BIM is a dynamic process that...

Full description

Bibliographic Details
Main Authors: Gerges, Michael, Ograbe Ahiakwo, Jaeger, Martin, Asaad, Ahmad
Format: Text
Language:English
Published: Zenodo 2016
Subjects:
BIM
Online Access:https://dx.doi.org/10.5281/zenodo.1111641
https://zenodo.org/record/1111641
Description
Summary:Recent advances of Building Information Modeling (BIM) especially in the Middle East have increased remarkably. Dubai has been taking a lead on this by making it mandatory for BIM to be adopted for all projects that involve complex architecture designs. This is because BIM is a dynamic process that assists all stakeholders in monitoring the project status throughout different project phases with great transparency. It focuses on utilizing information technology to improve collaboration among project participants during the entire life cycle of the project from the initial design, to the supply chain, resource allocation, construction and all productivity requirements. In view of this trend, the paper examines the extent of applying BIM in the State of Kuwait, by exploring practitioners’ perspectives on BIM, especially their perspectives on main barriers and main advantages. To this end structured interviews were carried out based on questionnaires and with a range of different construction professionals. The results revealed that practitioners perceive improved communication and mitigated project risks by encouraged collaboration between project participants. However, it was also observed that the full implementation of BIM in the State of Kuwait requires concerted efforts to make clients demanding BIM, counteract resistance to change among construction professionals and offer more training for design team members. This paper forms part of an on-going research effort on BIM and its application in the State of Kuwait and it is on this basis that further research on the topic is proposed. : {"references": ["P. Teicholz, \"Labor productivity declines in the construction industry: causes and remedies,\" AECbytes Viewpoint, vol. 4, no. 14, 2004.", "R. Sacks, L. Koskela, B. A. Dave, and R. Owen, \"Interaction of lean and Building Information Modeling in construction,\" Journal of Construction Engineering and Management, ASCE, vol. 136, no. 9, pp. 968-980, 2010.", "L. Chen, and H. Qu, \"Evaluation for \"economics and legislative factors influence the design team and contractor throughout a building project from inception to completion\",\" Journal of System and Management Sciences, vol. 1, no. 6, pp. 94-108, 2011.", "Y. Arayici, P. Coates, L. J. Koskela, M. Kagioglou, C. Usher, and K. OReilly, \"BIM adoption and implementation for architectural practices,\" Structural Survey, vol. 29, no. 1, pp. 7-25, 2011.", "D. Smith, \"An introduction to Building Information Modeling,\" Journal of Building Information Modeling, vol. 1, no. 1, pp. 12-14, 2007.", "NBIMS, National Building Information Model Standard Version 1.0- Part 1: Overview, Principles, and Methodologies, National Institute of Building Sciences, 2007.", "H. Penttil\u00e4, \"Describing the changes in architectural information technology to understand design complexity and free-form architectural expression,\" ITcon, pp. 395-408, 2006.", "K. Hannele, M. Reijo, M. Tarja, P. Sami, K. Jenni, and R. Teija, \"Expanding uses of building information modelling in life-cycle construction projects,\" Work-Journal of Prevention Assessment and Rehabilitation, vol. 41, pp. 114, 2012.", "B. Succar, \"Building information modeling framework: A research and delivery foundation for industry stakeholders,\" Automation in Construction, vol. 18, pp. 357-375, 2009.\n[10]\tB. Abbasnejad, and H. I. Moud, \"BIM and basic challenges associated with its definitions, interpretations and expectations,\" International Journal of Engineering Research and Applications, vol. 3, no. 2, pp. 287-294, 2013.\n[11]\tI. Kiani, A. Nobahar, S. Saeid, K. Ghomi, and A. K. B. Marsono, \"Barriers to implementation of Building Information Modeling in scheduling and planning phase in Iran,\" Australian Journal of Basic and Applied Sciences, vol. 9, no. 5, pp. 91-97, 2015.\n[12]\tP. G. Bernstein, and J. H. Pittman, \"Barrier in adopting Building Information Modeling (BIM) in the building industry,\" white paper presented in Autodesk building solutions, November 2004.\n[13]\tH. Dabo Baba, \"Building information modeling in local construction industry,\" doctoral dissertation, Faculty of Civil Engineering, Universiti Teknologi Malaysia, Malaysia, 2010.\n[14]\tM. H. Construction, \"The business value of BIM in North America: multi-year trend analysis and user ratings (2007-2012),\" Smart Market Report, Bedford, MA: McGraw Hill Construction, 2012.\n[15]\tD. B. Thompson, and R. G. Miner, \"Building information modeling-BIM: Contractual risks are changing with technology,\" www document, http://www. aepronet. org/ge/no35.html, assessed 15th Oct 2015.\n[16]\tM. Loosemore, \"International construction management research: cultural sensitivity in methodological design,\" Construction Management and Economics, vol. 17, no. 5, pp. 553-561, 1999.\n[17]\tE. Oney-Yazici, H. Giritli, G. Topcu-Oraz, and E. Acar, \"Organizational culture: The case of Turkish construction industry,\" Engineering, Construction and Architectural Management, vol. 14, no. 6, pp. 519-531, 2007.\n[18]\tW. Lu, Y. Peng, Q. P. Shen, and H. Li, \"Generic model for measuring benefits of BIM as a learning tool in construction tasks,\" Journal of Construction Engineering and Management, vol. 139, no. 2, pp. 195-203, 2013.\n[19]\tF. K. Y. Arayici, \"Roadmap for implementation of BIM in the UK construction industry,\" Engineering, Construction and Architectural Management, vol. 19, no. 6, pp. 610 \u2013 635, 2012.\n[20]\tS. Rizal, \"Changing roles of the clients, architects and contractors through BIM,\" Engineering, Construction and Architectural Management, vol. 18, no. 2, pp. 176 \u2013 187, 2011.\n[21]\tL. J. Cronbach, \"Coefficient alpha and the internal structure of tests,\" Psychometrika, vol. 16, no. 3, pp. 297-334, 1951.\n[22]\tL. Cohen, L. Manion, and K. Morrison, Research Methods in Education, Oxon, UK: Routledge, 2011, p. 640."]}