(Table 3) Calculated consolidation times for sedimentary sections of the Prydz Bay samples ...

For T = 0.05 (and less), only the top of the sediment, immediately beneath the applied load, is consolidated, whereas for T = 1, the sedimentary section is fully consolidated throughout. ...

Bibliographic Details
Main Authors: Solheim, Anders, Forsberg, Carl Fredrik, Pittenger, Alan
Format: Dataset
Language:English
Published: PANGAEA 1991
Subjects:
Online Access:https://dx.doi.org/10.1594/pangaea.757987
https://doi.pangaea.de/10.1594/PANGAEA.757987
Description
Summary:For T = 0.05 (and less), only the top of the sediment, immediately beneath the applied load, is consolidated, whereas for T = 1, the sedimentary section is fully consolidated throughout. ...