Improvement of Radwaste Management System at Bilibinskaya NPP in the Far North Conditions -13456
ABSTRACT Since 2009 Bilibinskay NPP is getting started to prepare to the decommissioning in the Far North conditions. Bilibinskaya NPP is located in the Far North of Russian Federation in Chukotka region. Since 1974 it operates 4 units EGP-6 with the capacity of 48 MW each. According to the contract...
Main Authors: | , , , |
---|---|
Other Authors: | |
Format: | Text |
Language: | English |
Subjects: | |
Online Access: | http://citeseerx.ist.psu.edu/viewdoc/summary?doi=10.1.1.1047.3932 http://www.wmsym.org/archives/2013/papers/13456.pdf |
Summary: | ABSTRACT Since 2009 Bilibinskay NPP is getting started to prepare to the decommissioning in the Far North conditions. Bilibinskaya NPP is located in the Far North of Russian Federation in Chukotka region. Since 1974 it operates 4 units EGP-6 with the capacity of 48 MW each. According to the contract, SIA Radon has performed the following works: -LLRW disposal safety analysis, -The technology of spent ion-exchanger and salt residue solidification is proposed, -Expected radwaste (till 2027) management economical analysis -Technical proposals for LLRW and IRW management. |
---|