Improvement of Radwaste Management System at Bilibinskaya NPP in the Far North Conditions -13456

ABSTRACT Since 2009 Bilibinskay NPP is getting started to prepare to the decommissioning in the Far North conditions. Bilibinskaya NPP is located in the Far North of Russian Federation in Chukotka region. Since 1974 it operates 4 units EGP-6 with the capacity of 48 MW each. According to the contract...

Full description

Bibliographic Details
Main Authors: Dr Mr Denis Fedorov, Dr Dmitry Adamovich, Alexander Savkin, Sue Sia Radon
Other Authors: The Pennsylvania State University CiteSeerX Archives
Format: Text
Language:English
Subjects:
Online Access:http://citeseerx.ist.psu.edu/viewdoc/summary?doi=10.1.1.1047.3932
http://www.wmsym.org/archives/2013/papers/13456.pdf
Description
Summary:ABSTRACT Since 2009 Bilibinskay NPP is getting started to prepare to the decommissioning in the Far North conditions. Bilibinskaya NPP is located in the Far North of Russian Federation in Chukotka region. Since 1974 it operates 4 units EGP-6 with the capacity of 48 MW each. According to the contract, SIA Radon has performed the following works: -LLRW disposal safety analysis, -The technology of spent ion-exchanger and salt residue solidification is proposed, -Expected radwaste (till 2027) management economical analysis -Technical proposals for LLRW and IRW management.