NOAA ETL LIDAR DABUL System FINAL 10-min Avg Depol Ratio (GIF) [Intrieri, J.]

NOAA ETL deployed the Depolarization and Backscatter - Unattended LIDAR (DABUL) aboard the SHEBA ship. Images are FINAL 10-minute averaged depolarization ratio intensity (1 image per day) for most of the SHEBA Field Project.

Bibliographic Details
Format: Dataset
Language:unknown
Published: Arctic Data Center 2015
Subjects:
Online Access:https://search.dataone.org/view/urn:uuid:6afd915f-2afb-4983-b46f-a654b5832fb3
Description
Summary:NOAA ETL deployed the Depolarization and Backscatter - Unattended LIDAR (DABUL) aboard the SHEBA ship. Images are FINAL 10-minute averaged depolarization ratio intensity (1 image per day) for most of the SHEBA Field Project.