Swiss Projects

Abstract The Châtelard access tunnel for the Nant De Drance pumped storage power station was driven in 2009. The portal represented a great challenge for the designer and the contractor because the railway line from Martigny to Chamonix is only 3 m above the top heading. The support at the portal co...

Full description

Bibliographic Details
Published in:Geomechanics and Tunnelling
Format: Article in Journal/Newspaper
Language:English
Published: Wiley 2011
Subjects:
Online Access:http://dx.doi.org/10.1002/geot.201190051
https://api.wiley.com/onlinelibrary/tdm/v1/articles/10.1002%2Fgeot.201190051
https://onlinelibrary.wiley.com/doi/pdf/10.1002/geot.201190051