Abstract The Châtelard access tunnel for the Nant De Drance pumped storage power station was driven in 2009. The portal represented a great challenge for the designer and the contractor because the railway line from Martigny to Chamonix is only 3 m above the top heading. The support at the portal co...

Full description

Bibliographic Details
Published in:Geomechanics and Tunnelling
Format: Article in Journal/Newspaper
Language:English
Published: Wiley 2011
Subjects:
Online Access:http://dx.doi.org/10.1002/geot.201190051
https://api.wiley.com/onlinelibrary/tdm/v1/articles/10.1002%2Fgeot.201190051
https://onlinelibrary.wiley.com/doi/pdf/10.1002/geot.201190051
id crwiley:10.1002/geot.201190051
record_format openpolar
spelling crwiley:10.1002/geot.201190051 2024-06-02T08:10:10+00:00 Swiss Projects 2011 http://dx.doi.org/10.1002/geot.201190051 https://api.wiley.com/onlinelibrary/tdm/v1/articles/10.1002%2Fgeot.201190051 https://onlinelibrary.wiley.com/doi/pdf/10.1002/geot.201190051 en eng Wiley http://onlinelibrary.wiley.com/termsAndConditions#vor Geomechanics and Tunnelling volume 4, issue 6 ISSN 1865-7362 1865-7389 journal-article 2011 crwiley https://doi.org/10.1002/geot.201190051 2024-05-03T11:17:25Z Abstract The Châtelard access tunnel for the Nant De Drance pumped storage power station was driven in 2009. The portal represented a great challenge for the designer and the contractor because the railway line from Martigny to Chamonix is only 3 m above the top heading. The support at the portal consists of a reinforced concrete beam, prestressed anchors 25 to 35 m long and 9 m long rock bolts (see report on page 627). Für das Pumpspeicherkraftwerk Nant De Drance wurde in 2009 der Zugangstunnel Châtelard aufgefahren. Das Portal stellte hohe Ansprüche an Planer und Unternehmer, da die Bahnverbindung Martigny‐Chamonix mit weniger als 3 m Abstand zur Kalotte unterfahren werden musste. Die Sicherung im Portalbereich besteht aus einem Stahlbetonbalken, 25 bis 35 m langen Vorspannankern und 9 m langen Felsnägeln (siehe Bericht auf Seite 627). Article in Journal/Newspaper Long Rock Wiley Online Library Langen ENVELOPE(11.650,11.650,-70.750,-70.750) Long Rock ENVELOPE(-61.198,-61.198,-62.689,-62.689) The Portal ENVELOPE(159.167,159.167,-78.100,-78.100) Geomechanics and Tunnelling 4 6
institution Open Polar
collection Wiley Online Library
op_collection_id crwiley
language English
description Abstract The Châtelard access tunnel for the Nant De Drance pumped storage power station was driven in 2009. The portal represented a great challenge for the designer and the contractor because the railway line from Martigny to Chamonix is only 3 m above the top heading. The support at the portal consists of a reinforced concrete beam, prestressed anchors 25 to 35 m long and 9 m long rock bolts (see report on page 627). Für das Pumpspeicherkraftwerk Nant De Drance wurde in 2009 der Zugangstunnel Châtelard aufgefahren. Das Portal stellte hohe Ansprüche an Planer und Unternehmer, da die Bahnverbindung Martigny‐Chamonix mit weniger als 3 m Abstand zur Kalotte unterfahren werden musste. Die Sicherung im Portalbereich besteht aus einem Stahlbetonbalken, 25 bis 35 m langen Vorspannankern und 9 m langen Felsnägeln (siehe Bericht auf Seite 627).
format Article in Journal/Newspaper
title Swiss Projects
spellingShingle Swiss Projects
title_short Swiss Projects
title_full Swiss Projects
title_fullStr Swiss Projects
title_full_unstemmed Swiss Projects
title_sort swiss projects
publisher Wiley
publishDate 2011
url http://dx.doi.org/10.1002/geot.201190051
https://api.wiley.com/onlinelibrary/tdm/v1/articles/10.1002%2Fgeot.201190051
https://onlinelibrary.wiley.com/doi/pdf/10.1002/geot.201190051
long_lat ENVELOPE(11.650,11.650,-70.750,-70.750)
ENVELOPE(-61.198,-61.198,-62.689,-62.689)
ENVELOPE(159.167,159.167,-78.100,-78.100)
geographic Langen
Long Rock
The Portal
geographic_facet Langen
Long Rock
The Portal
genre Long Rock
genre_facet Long Rock
op_source Geomechanics and Tunnelling
volume 4, issue 6
ISSN 1865-7362 1865-7389
op_rights http://onlinelibrary.wiley.com/termsAndConditions#vor
op_doi https://doi.org/10.1002/geot.201190051
container_title Geomechanics and Tunnelling
container_volume 4
container_issue 6
_version_ 1800755982952824832