D5.1 Initial System Test Report

This document describes the overall deployment of the EDEN ISS Mobile Test Facility to Antarctica. It builds upon the EDEN ISS-DLR-WP4.4-D4.4-Overall System Test Report which described the assembly, integration and test phase of the project as well as the preparation and transport of the facility to...

Full description

Bibliographic Details
Main Authors: Bamsey, Matthew, Zabel, Paul, Vrakking, Vincent, Zeidler, Conrad, Schubert, Daniel
Format: Report
Language:unknown
Published: Zenodo 2018
Subjects:
Online Access:https://doi.org/10.5281/zenodo.3229910
id ftzenodo:oai:zenodo.org:3229910
record_format openpolar
spelling ftzenodo:oai:zenodo.org:3229910 2024-09-15T17:43:24+00:00 D5.1 Initial System Test Report Bamsey, Matthew Zabel, Paul Vrakking, Vincent Zeidler, Conrad Schubert, Daniel 2018-09-30 https://doi.org/10.5281/zenodo.3229910 unknown Zenodo https://zenodo.org/communities/edeniss https://zenodo.org/communities/eu https://doi.org/10.5281/zenodo.3229909 https://doi.org/10.5281/zenodo.3229910 oai:zenodo.org:3229910 info:eu-repo/semantics/openAccess Creative Commons Attribution 4.0 International https://creativecommons.org/licenses/by/4.0/legalcode info:eu-repo/semantics/report 2018 ftzenodo https://doi.org/10.5281/zenodo.322991010.5281/zenodo.3229909 2024-07-26T02:37:42Z This document describes the overall deployment of the EDEN ISS Mobile Test Facility to Antarctica. It builds upon the EDEN ISS-DLR-WP4.4-D4.4-Overall System Test Report which described the assembly, integration and test phase of the project as well as the preparation and transport of the facility to Antarctica. This Initial System Test Report commences with the offloading of the Mobile Test Facility from the S.A. Agulhas II research vessel in the vicinity of the Neumayer Station III. It then describes the installation activities, results of initial on-site tests, issues encountered during the installation, as well as particular design modifications incorporated into the facility. Report Antarc* Antarctica Zenodo
institution Open Polar
collection Zenodo
op_collection_id ftzenodo
language unknown
description This document describes the overall deployment of the EDEN ISS Mobile Test Facility to Antarctica. It builds upon the EDEN ISS-DLR-WP4.4-D4.4-Overall System Test Report which described the assembly, integration and test phase of the project as well as the preparation and transport of the facility to Antarctica. This Initial System Test Report commences with the offloading of the Mobile Test Facility from the S.A. Agulhas II research vessel in the vicinity of the Neumayer Station III. It then describes the installation activities, results of initial on-site tests, issues encountered during the installation, as well as particular design modifications incorporated into the facility.
format Report
author Bamsey, Matthew
Zabel, Paul
Vrakking, Vincent
Zeidler, Conrad
Schubert, Daniel
spellingShingle Bamsey, Matthew
Zabel, Paul
Vrakking, Vincent
Zeidler, Conrad
Schubert, Daniel
D5.1 Initial System Test Report
author_facet Bamsey, Matthew
Zabel, Paul
Vrakking, Vincent
Zeidler, Conrad
Schubert, Daniel
author_sort Bamsey, Matthew
title D5.1 Initial System Test Report
title_short D5.1 Initial System Test Report
title_full D5.1 Initial System Test Report
title_fullStr D5.1 Initial System Test Report
title_full_unstemmed D5.1 Initial System Test Report
title_sort d5.1 initial system test report
publisher Zenodo
publishDate 2018
url https://doi.org/10.5281/zenodo.3229910
genre Antarc*
Antarctica
genre_facet Antarc*
Antarctica
op_relation https://zenodo.org/communities/edeniss
https://zenodo.org/communities/eu
https://doi.org/10.5281/zenodo.3229909
https://doi.org/10.5281/zenodo.3229910
oai:zenodo.org:3229910
op_rights info:eu-repo/semantics/openAccess
Creative Commons Attribution 4.0 International
https://creativecommons.org/licenses/by/4.0/legalcode
op_doi https://doi.org/10.5281/zenodo.322991010.5281/zenodo.3229909
_version_ 1810490377486991360