Geothermal Gas Emission From Hellisheidi and Nesjavellir Power Plants

Emission of geothermal gases is an inevitable part of high temperature geothermal utilization. Annually Hellisheiði and Nesjavellir Power Plants Iceland emit 61800 tons CO2 and 28200 H2S. New regulation set by the government of Iceland in 2010 on H2S concentration in air puts high demands on the geo...

Full description

Bibliographic Details
Main Author: Ingvi Gunnarsson, Edda Sif Aradóttir, Bergur Sigfússon, Einar Gunnlaugsson and Bjarni Már Júlíusson
Format: Article in Journal/Newspaper
Language:unknown
Published: 2013
Subjects:
Online Access:https://zenodo.org/record/12897
https://doi.org/10.5281/zenodo.12897
id ftzenodo:oai:zenodo.org:12897
record_format openpolar
spelling ftzenodo:oai:zenodo.org:12897 2023-05-15T16:47:29+02:00 Geothermal Gas Emission From Hellisheidi and Nesjavellir Power Plants Ingvi Gunnarsson, Edda Sif Aradóttir, Bergur Sigfússon, Einar Gunnlaugsson and Bjarni Már Júlíusson 2013-11-26 https://zenodo.org/record/12897 https://doi.org/10.5281/zenodo.12897 unknown https://zenodo.org/record/12897 https://doi.org/10.5281/zenodo.12897 oai:zenodo.org:12897 info:eu-repo/semantics/openAccess https://creativecommons.org/licenses/by/4.0/legalcode info:eu-repo/semantics/article publication-article 2013 ftzenodo https://doi.org/10.5281/zenodo.12897 2023-03-11T02:16:57Z Emission of geothermal gases is an inevitable part of high temperature geothermal utilization. Annually Hellisheiði and Nesjavellir Power Plants Iceland emit 61800 tons CO2 and 28200 H2S. New regulation set by the government of Iceland in 2010 on H2S concentration in air puts high demands on the geothermal industry in Iceland to lower H2S emission from their power plants. Reykjavík Energy has been working on solution to lower gas emission from its power plants since commissioning of hot water production in Nesjavellir power plant in 1990. Since commissioning of Hellisheiði Power Plant in 2006 that was followed by an increase in H2S concentration in nearby town and communities more focus was put on H2S abatement. Three experimental pilot scale projects have been in planning and operation since 2006. Gas separation station involves separating geothermal gas into soluble (CO2 and H2S) and non-soluble gases (H2, N2, Ar) and two experimental gas re-injection projects SulFix and CarbFix have been or are being carried out. The geothermal gases are dissolved in water and injected into the bedrock. In SulFix the target zone is the >200°C high temperature geothermal system below 800 m and in Carbfix the target zone is 30-80 °C between 400-800 m. Industrial scale injection of geothermal gases is planned in 2014 where around 15% of H2S from Hellisheiði Power Plant will be injected into >200°C formations along with CO2 after dissolution in condensate water from the power plant. Further increase in gas injection from Hellisheiði Power Plant will then be planned based on the experience of that injection. Injection of H2S back into the geothermal system where it came from has to be considered an environmentally benign method of H2S abatement. Article in Journal/Newspaper Iceland Reykjavík Reykjavík Zenodo Nesjavellir ENVELOPE(-21.251,-21.251,64.115,64.115) Reykjavík
institution Open Polar
collection Zenodo
op_collection_id ftzenodo
language unknown
description Emission of geothermal gases is an inevitable part of high temperature geothermal utilization. Annually Hellisheiði and Nesjavellir Power Plants Iceland emit 61800 tons CO2 and 28200 H2S. New regulation set by the government of Iceland in 2010 on H2S concentration in air puts high demands on the geothermal industry in Iceland to lower H2S emission from their power plants. Reykjavík Energy has been working on solution to lower gas emission from its power plants since commissioning of hot water production in Nesjavellir power plant in 1990. Since commissioning of Hellisheiði Power Plant in 2006 that was followed by an increase in H2S concentration in nearby town and communities more focus was put on H2S abatement. Three experimental pilot scale projects have been in planning and operation since 2006. Gas separation station involves separating geothermal gas into soluble (CO2 and H2S) and non-soluble gases (H2, N2, Ar) and two experimental gas re-injection projects SulFix and CarbFix have been or are being carried out. The geothermal gases are dissolved in water and injected into the bedrock. In SulFix the target zone is the >200°C high temperature geothermal system below 800 m and in Carbfix the target zone is 30-80 °C between 400-800 m. Industrial scale injection of geothermal gases is planned in 2014 where around 15% of H2S from Hellisheiði Power Plant will be injected into >200°C formations along with CO2 after dissolution in condensate water from the power plant. Further increase in gas injection from Hellisheiði Power Plant will then be planned based on the experience of that injection. Injection of H2S back into the geothermal system where it came from has to be considered an environmentally benign method of H2S abatement.
format Article in Journal/Newspaper
author Ingvi Gunnarsson, Edda Sif Aradóttir, Bergur Sigfússon, Einar Gunnlaugsson and Bjarni Már Júlíusson
spellingShingle Ingvi Gunnarsson, Edda Sif Aradóttir, Bergur Sigfússon, Einar Gunnlaugsson and Bjarni Már Júlíusson
Geothermal Gas Emission From Hellisheidi and Nesjavellir Power Plants
author_facet Ingvi Gunnarsson, Edda Sif Aradóttir, Bergur Sigfússon, Einar Gunnlaugsson and Bjarni Már Júlíusson
author_sort Ingvi Gunnarsson, Edda Sif Aradóttir, Bergur Sigfússon, Einar Gunnlaugsson and Bjarni Már Júlíusson
title Geothermal Gas Emission From Hellisheidi and Nesjavellir Power Plants
title_short Geothermal Gas Emission From Hellisheidi and Nesjavellir Power Plants
title_full Geothermal Gas Emission From Hellisheidi and Nesjavellir Power Plants
title_fullStr Geothermal Gas Emission From Hellisheidi and Nesjavellir Power Plants
title_full_unstemmed Geothermal Gas Emission From Hellisheidi and Nesjavellir Power Plants
title_sort geothermal gas emission from hellisheidi and nesjavellir power plants
publishDate 2013
url https://zenodo.org/record/12897
https://doi.org/10.5281/zenodo.12897
long_lat ENVELOPE(-21.251,-21.251,64.115,64.115)
geographic Nesjavellir
Reykjavík
geographic_facet Nesjavellir
Reykjavík
genre Iceland
Reykjavík
Reykjavík
genre_facet Iceland
Reykjavík
Reykjavík
op_relation https://zenodo.org/record/12897
https://doi.org/10.5281/zenodo.12897
oai:zenodo.org:12897
op_rights info:eu-repo/semantics/openAccess
https://creativecommons.org/licenses/by/4.0/legalcode
op_doi https://doi.org/10.5281/zenodo.12897
_version_ 1766037573703041024