INVESTIGATING THE FEASIBILITY AND THE POLICIES FOR WIND POWER REPOWERING IN SWEDISH MUNICIPALITIES

Transitioning to a low-carbon energy system includes deploying renewables such as wind power, which has been installed in Sweden since the 1980s. After a 20 to 25-year lifetime, a wind turbine´s end-of-life options come into play, therefore many of the turbines deployed in Sweden prior to 2011 will...

Full description

Bibliographic Details
Main Author: Roško, Samuel
Format: Bachelor Thesis
Language:English
Published: Uppsala universitet, Institutionen för geovetenskaper 2023
Subjects:
AEP
Online Access:http://urn.kb.se/resolve?urn=urn:nbn:se:uu:diva-503629
id ftuppsalauniv:oai:DiVA.org:uu-503629
record_format openpolar
spelling ftuppsalauniv:oai:DiVA.org:uu-503629 2023-06-18T03:42:43+02:00 INVESTIGATING THE FEASIBILITY AND THE POLICIES FOR WIND POWER REPOWERING IN SWEDISH MUNICIPALITIES Roško, Samuel 2023 application/pdf http://urn.kb.se/resolve?urn=urn:nbn:se:uu:diva-503629 eng eng Uppsala universitet, Institutionen för geovetenskaper http://urn.kb.se/resolve?urn=urn:nbn:se:uu:diva-503629 info:eu-repo/semantics/openAccess wind power full repowering onshore wind economic feasibility financial viability WindPro municipal policy comprehensive plans Swedish municipalities case studies AEP noise shadow Energy Systems Energisystem Student thesis info:eu-repo/semantics/bachelorThesis text 2023 ftuppsalauniv 2023-06-07T22:30:50Z Transitioning to a low-carbon energy system includes deploying renewables such as wind power, which has been installed in Sweden since the 1980s. After a 20 to 25-year lifetime, a wind turbine´s end-of-life options come into play, therefore many of the turbines deployed in Sweden prior to 2011 will reach this mark by 2035. To utilize a site´s wind resource in the best possible way, full repowering is considered in an assessment of seven case studies in Swedish municipalities with the highest deployed pre-2011 wind power capacity. Each case study uses various turbine models to evaluate full repowering scenarios. The most profitable scenarios are estimated through the investment over production (I/P) value and the break-even electricity price. The identified municipalities’ comprehensive plans are reviewed in terms of repowering strategies and wind power deployment guidelines. Only three out of seven investigated municipalities consider repowering in comprehensive plans, with Gotland being best prepared in terms of repowering strategies. Strömsund and Eslöv mention repowering in their comprehensive plans with no specific guidelines. Restrictive policies were identified in the municipality of Laholm, where the maximum total height of turbines is 150m, decreasing the potential annual energy production of an analyzed case study by 64%. The municipalities of Falkenberg, Laholm, Piteå, and Åsele do not include repowering in their comprehensive plans. All the simulated repowering scenarios increased the annual energy production of the identified sites by up to 73%, lowered the number of turbines by up to 70%, decreased the wake losses by up to 77%, and decreased the noise level by 10% while increasing the potential shadow flicker by 19%. The results of the study indicate a possible divide between the intention of the municipalities of Eslöv, Strömsund, and Åsele to maximize energy production from wind power at each exploited site on the one hand and the business cases that developers face on the other. The results ... Bachelor Thesis Piteå Uppsala University: Publications (DiVA) Strömsund ENVELOPE(22.383,22.383,65.883,65.883)
institution Open Polar
collection Uppsala University: Publications (DiVA)
op_collection_id ftuppsalauniv
language English
topic wind power
full repowering
onshore wind
economic feasibility
financial viability
WindPro
municipal policy
comprehensive plans
Swedish municipalities
case studies
AEP
noise
shadow
Energy Systems
Energisystem
spellingShingle wind power
full repowering
onshore wind
economic feasibility
financial viability
WindPro
municipal policy
comprehensive plans
Swedish municipalities
case studies
AEP
noise
shadow
Energy Systems
Energisystem
Roško, Samuel
INVESTIGATING THE FEASIBILITY AND THE POLICIES FOR WIND POWER REPOWERING IN SWEDISH MUNICIPALITIES
topic_facet wind power
full repowering
onshore wind
economic feasibility
financial viability
WindPro
municipal policy
comprehensive plans
Swedish municipalities
case studies
AEP
noise
shadow
Energy Systems
Energisystem
description Transitioning to a low-carbon energy system includes deploying renewables such as wind power, which has been installed in Sweden since the 1980s. After a 20 to 25-year lifetime, a wind turbine´s end-of-life options come into play, therefore many of the turbines deployed in Sweden prior to 2011 will reach this mark by 2035. To utilize a site´s wind resource in the best possible way, full repowering is considered in an assessment of seven case studies in Swedish municipalities with the highest deployed pre-2011 wind power capacity. Each case study uses various turbine models to evaluate full repowering scenarios. The most profitable scenarios are estimated through the investment over production (I/P) value and the break-even electricity price. The identified municipalities’ comprehensive plans are reviewed in terms of repowering strategies and wind power deployment guidelines. Only three out of seven investigated municipalities consider repowering in comprehensive plans, with Gotland being best prepared in terms of repowering strategies. Strömsund and Eslöv mention repowering in their comprehensive plans with no specific guidelines. Restrictive policies were identified in the municipality of Laholm, where the maximum total height of turbines is 150m, decreasing the potential annual energy production of an analyzed case study by 64%. The municipalities of Falkenberg, Laholm, Piteå, and Åsele do not include repowering in their comprehensive plans. All the simulated repowering scenarios increased the annual energy production of the identified sites by up to 73%, lowered the number of turbines by up to 70%, decreased the wake losses by up to 77%, and decreased the noise level by 10% while increasing the potential shadow flicker by 19%. The results of the study indicate a possible divide between the intention of the municipalities of Eslöv, Strömsund, and Åsele to maximize energy production from wind power at each exploited site on the one hand and the business cases that developers face on the other. The results ...
format Bachelor Thesis
author Roško, Samuel
author_facet Roško, Samuel
author_sort Roško, Samuel
title INVESTIGATING THE FEASIBILITY AND THE POLICIES FOR WIND POWER REPOWERING IN SWEDISH MUNICIPALITIES
title_short INVESTIGATING THE FEASIBILITY AND THE POLICIES FOR WIND POWER REPOWERING IN SWEDISH MUNICIPALITIES
title_full INVESTIGATING THE FEASIBILITY AND THE POLICIES FOR WIND POWER REPOWERING IN SWEDISH MUNICIPALITIES
title_fullStr INVESTIGATING THE FEASIBILITY AND THE POLICIES FOR WIND POWER REPOWERING IN SWEDISH MUNICIPALITIES
title_full_unstemmed INVESTIGATING THE FEASIBILITY AND THE POLICIES FOR WIND POWER REPOWERING IN SWEDISH MUNICIPALITIES
title_sort investigating the feasibility and the policies for wind power repowering in swedish municipalities
publisher Uppsala universitet, Institutionen för geovetenskaper
publishDate 2023
url http://urn.kb.se/resolve?urn=urn:nbn:se:uu:diva-503629
long_lat ENVELOPE(22.383,22.383,65.883,65.883)
geographic Strömsund
geographic_facet Strömsund
genre Piteå
genre_facet Piteå
op_relation http://urn.kb.se/resolve?urn=urn:nbn:se:uu:diva-503629
op_rights info:eu-repo/semantics/openAccess
_version_ 1769008744284291072