KAJIAN TEKNIS PENGEBORAN DAN PELEDAKAN PADA KEGIATAN PENGUPASAN OVERBURDEN DI TAMBANG BATUBARA PT. BUKIT MAKMUR MANDIRI UTAMA JOBSITE LATI KALIMANTAN TIMUR

PT. Bukit Makmur Mandiri Utama is one of PT. Berau Coal’s mining contractor that located in Sambakungan Village, Gunung Tabur, Berau, East Borneo province. Mining activities at PT. Bukit Makmur Mandiri Utama - Lati divided in 3 locations namely Pit Quarry West, East Pit, Pit T 07. Mining is done by...

Full description

Bibliographic Details
Main Author: KHAFRAWI, KHAFRAWI
Format: Thesis
Language:English
Published: 2012
Subjects:
DML
Online Access:http://repository.upnyk.ac.id/4983/
http://repository.upnyk.ac.id/4983/1/abstract_KHAFRAWI_%28112060062%29.pdf
id ftupnvetyogyakar:oai:generic.eprints.org:4983
record_format openpolar
spelling ftupnvetyogyakar:oai:generic.eprints.org:4983 2023-05-15T16:02:09+02:00 KAJIAN TEKNIS PENGEBORAN DAN PELEDAKAN PADA KEGIATAN PENGUPASAN OVERBURDEN DI TAMBANG BATUBARA PT. BUKIT MAKMUR MANDIRI UTAMA JOBSITE LATI KALIMANTAN TIMUR KHAFRAWI, KHAFRAWI 2012 application/pdf http://repository.upnyk.ac.id/4983/ http://repository.upnyk.ac.id/4983/1/abstract_KHAFRAWI_%28112060062%29.pdf en eng http://repository.upnyk.ac.id/4983/1/abstract_KHAFRAWI_%28112060062%29.pdf KHAFRAWI, KHAFRAWI (2012) KAJIAN TEKNIS PENGEBORAN DAN PELEDAKAN PADA KEGIATAN PENGUPASAN OVERBURDEN DI TAMBANG BATUBARA PT. BUKIT MAKMUR MANDIRI UTAMA JOBSITE LATI KALIMANTAN TIMUR. Other thesis, UPN "Veteran" Yogyakarta. 600 Teknologi Thesis NonPeerReviewed 2012 ftupnvetyogyakar 2023-04-10T15:58:12Z PT. Bukit Makmur Mandiri Utama is one of PT. Berau Coal’s mining contractor that located in Sambakungan Village, Gunung Tabur, Berau, East Borneo province. Mining activities at PT. Bukit Makmur Mandiri Utama - Lati divided in 3 locations namely Pit Quarry West, East Pit, Pit T 07. Mining is done by open-pit mining system (surface mining) with open pit mine method. Overburden production target of Pit West in 2010 to get coal at 6.702.000 tons is 51.703.000 BCM/year. Drilling and blasting activities that conducted by PT. BUMA is 70% in order to meet overburden target. Drilling activities is currently using Atlas Copco DML 50 with a 9 inch diameter drill bit (228.6 mm). Staggered Pattern with non-electrical model is used as PT. BUMA’s drilling pattern. Base on the observations that known the average of drilling and balsting production is 84.630.29 BCM/day, with the size of the fragmentation in boulder form with size ≥ 190 cm by 20%. The actual total production has not been able to meet the production targets for drilling and blasting as planned for 100,813.65 BCM/day. Eventually base on the achievment, blasting activities is could not be said to be successful and need to be repaired. Currently blasting geometry is using burden size 10 m, 12 m spacing, hole depth 8,5 m, 3,5 m Stemming, columns of explosives 4,5 m and 0,5 m subdrilling. Emulsion Trojan 4070 with powder factor average 0.32 Kg/m3 is used as explosives. To reduce the amount of boulder , improvement on blasting geometry is suggested based on the CJ.Konya’s theory. The results obtained the new geometry’s design , 9,36 m of burden, 9,19 m of spacing, 6.55 m of stemming, 4.25 m of powder charge, 2.8 m of subdrilling, high levels of 8 m, and the hole depth is 10.8 m with 0.29 Kg/m3 powder factor, and the production of blasting is 105,064.12 BCM/day. The calculation of the theoretical prediction of rock fragmentation for the new design using Kuznetsov’s theory obtained material size > 190 cm (boulder) is decrease from 20 % to 7.66%. Thesis DML UPN (Universitas Pembangunan Nasional) Veteran Yogyakarta: Institutional Repository
institution Open Polar
collection UPN (Universitas Pembangunan Nasional) Veteran Yogyakarta: Institutional Repository
op_collection_id ftupnvetyogyakar
language English
topic 600 Teknologi
spellingShingle 600 Teknologi
KHAFRAWI, KHAFRAWI
KAJIAN TEKNIS PENGEBORAN DAN PELEDAKAN PADA KEGIATAN PENGUPASAN OVERBURDEN DI TAMBANG BATUBARA PT. BUKIT MAKMUR MANDIRI UTAMA JOBSITE LATI KALIMANTAN TIMUR
topic_facet 600 Teknologi
description PT. Bukit Makmur Mandiri Utama is one of PT. Berau Coal’s mining contractor that located in Sambakungan Village, Gunung Tabur, Berau, East Borneo province. Mining activities at PT. Bukit Makmur Mandiri Utama - Lati divided in 3 locations namely Pit Quarry West, East Pit, Pit T 07. Mining is done by open-pit mining system (surface mining) with open pit mine method. Overburden production target of Pit West in 2010 to get coal at 6.702.000 tons is 51.703.000 BCM/year. Drilling and blasting activities that conducted by PT. BUMA is 70% in order to meet overburden target. Drilling activities is currently using Atlas Copco DML 50 with a 9 inch diameter drill bit (228.6 mm). Staggered Pattern with non-electrical model is used as PT. BUMA’s drilling pattern. Base on the observations that known the average of drilling and balsting production is 84.630.29 BCM/day, with the size of the fragmentation in boulder form with size ≥ 190 cm by 20%. The actual total production has not been able to meet the production targets for drilling and blasting as planned for 100,813.65 BCM/day. Eventually base on the achievment, blasting activities is could not be said to be successful and need to be repaired. Currently blasting geometry is using burden size 10 m, 12 m spacing, hole depth 8,5 m, 3,5 m Stemming, columns of explosives 4,5 m and 0,5 m subdrilling. Emulsion Trojan 4070 with powder factor average 0.32 Kg/m3 is used as explosives. To reduce the amount of boulder , improvement on blasting geometry is suggested based on the CJ.Konya’s theory. The results obtained the new geometry’s design , 9,36 m of burden, 9,19 m of spacing, 6.55 m of stemming, 4.25 m of powder charge, 2.8 m of subdrilling, high levels of 8 m, and the hole depth is 10.8 m with 0.29 Kg/m3 powder factor, and the production of blasting is 105,064.12 BCM/day. The calculation of the theoretical prediction of rock fragmentation for the new design using Kuznetsov’s theory obtained material size > 190 cm (boulder) is decrease from 20 % to 7.66%.
format Thesis
author KHAFRAWI, KHAFRAWI
author_facet KHAFRAWI, KHAFRAWI
author_sort KHAFRAWI, KHAFRAWI
title KAJIAN TEKNIS PENGEBORAN DAN PELEDAKAN PADA KEGIATAN PENGUPASAN OVERBURDEN DI TAMBANG BATUBARA PT. BUKIT MAKMUR MANDIRI UTAMA JOBSITE LATI KALIMANTAN TIMUR
title_short KAJIAN TEKNIS PENGEBORAN DAN PELEDAKAN PADA KEGIATAN PENGUPASAN OVERBURDEN DI TAMBANG BATUBARA PT. BUKIT MAKMUR MANDIRI UTAMA JOBSITE LATI KALIMANTAN TIMUR
title_full KAJIAN TEKNIS PENGEBORAN DAN PELEDAKAN PADA KEGIATAN PENGUPASAN OVERBURDEN DI TAMBANG BATUBARA PT. BUKIT MAKMUR MANDIRI UTAMA JOBSITE LATI KALIMANTAN TIMUR
title_fullStr KAJIAN TEKNIS PENGEBORAN DAN PELEDAKAN PADA KEGIATAN PENGUPASAN OVERBURDEN DI TAMBANG BATUBARA PT. BUKIT MAKMUR MANDIRI UTAMA JOBSITE LATI KALIMANTAN TIMUR
title_full_unstemmed KAJIAN TEKNIS PENGEBORAN DAN PELEDAKAN PADA KEGIATAN PENGUPASAN OVERBURDEN DI TAMBANG BATUBARA PT. BUKIT MAKMUR MANDIRI UTAMA JOBSITE LATI KALIMANTAN TIMUR
title_sort kajian teknis pengeboran dan peledakan pada kegiatan pengupasan overburden di tambang batubara pt. bukit makmur mandiri utama jobsite lati kalimantan timur
publishDate 2012
url http://repository.upnyk.ac.id/4983/
http://repository.upnyk.ac.id/4983/1/abstract_KHAFRAWI_%28112060062%29.pdf
genre DML
genre_facet DML
op_relation http://repository.upnyk.ac.id/4983/1/abstract_KHAFRAWI_%28112060062%29.pdf
KHAFRAWI, KHAFRAWI (2012) KAJIAN TEKNIS PENGEBORAN DAN PELEDAKAN PADA KEGIATAN PENGUPASAN OVERBURDEN DI TAMBANG BATUBARA PT. BUKIT MAKMUR MANDIRI UTAMA JOBSITE LATI KALIMANTAN TIMUR. Other thesis, UPN "Veteran" Yogyakarta.
_version_ 1766397753974325248