STR-814: LESSONS LEARNED FROM THE NAIRN AVENUE OVERPASS CONCRETE GIRDER & PIER REPAIRS

The Nairn Avenue Overpass is a 213 m long, 11-span, 4-lane + sidewalk precast prestressed concrete I-girder bridge over the CP Keewatin Subdivision line in Winnipeg, MB. The superstructure consists of three continuous segments with deck joints at piers #3 and #8. The structure was built in 1967, and...

Full description

Bibliographic Details
Main Authors: Neilson, David A., Burmey, Darren, Loptson, Scott
Format: Text
Language:unknown
Published: Scholarship@Western 2016
Subjects:
Online Access:https://ir.lib.uwo.ca/csce2016/London/Structural/8
https://ir.lib.uwo.ca/context/csce2016/article/1115/viewcontent/STR_814.pdf
id ftunivwestonta:oai:ir.lib.uwo.ca:csce2016-1115
record_format openpolar
spelling ftunivwestonta:oai:ir.lib.uwo.ca:csce2016-1115 2023-10-01T03:57:08+02:00 STR-814: LESSONS LEARNED FROM THE NAIRN AVENUE OVERPASS CONCRETE GIRDER & PIER REPAIRS Neilson, David A. Burmey, Darren Loptson, Scott 2016-06-01T07:00:00Z application/pdf https://ir.lib.uwo.ca/csce2016/London/Structural/8 https://ir.lib.uwo.ca/context/csce2016/article/1115/viewcontent/STR_814.pdf unknown Scholarship@Western https://ir.lib.uwo.ca/csce2016/London/Structural/8 https://ir.lib.uwo.ca/context/csce2016/article/1115/viewcontent/STR_814.pdf Canadian Society for Civil Engineering Structural Engineering text 2016 ftunivwestonta 2023-09-03T06:59:35Z The Nairn Avenue Overpass is a 213 m long, 11-span, 4-lane + sidewalk precast prestressed concrete I-girder bridge over the CP Keewatin Subdivision line in Winnipeg, MB. The superstructure consists of three continuous segments with deck joints at piers #3 and #8. The structure was built in 1967, and underwent major strengthening and rehabilitation of the deck, girders, and bearings in 1985. Piers consist of a cast-in-place pier cap approximately 18 m long supported on two cast-in-place columns approximately 7 to 8 m tall supported on concrete pile caps over timber raft-pile foundations. Leaking omega-style strip seal deck joints at Pier #3 and Pier #8 have exposed the piers and girder ends to chloride contaminated run-off from the deck. In 2002, the pier caps were re-faced on three sides and provided with galvanic anode cathodic protection, and the pier columns received local patch repairs only. In 2014, during a deck rehabilitation project that included rehabilitating the deck joints, Morrison Hershfield (the Consultant) noted significant deterioration of pier column concrete including staining, moderate-to-severe cracking and localized spalling. The Consultant was subsequently engaged by the City of Winnipeg (City) to conduct a field investigation to quantify the degree of deterioration, evaluate alternatives, and undertake design and construction administration of the preferred solution. This presentation describes these steps, and lessons learned from the Contractor, Consultant, and Owner’s perspective. Text Keewatin The University of Western Ontario: Scholarship@Western Morrison ENVELOPE(-63.533,-63.533,-66.167,-66.167)
institution Open Polar
collection The University of Western Ontario: Scholarship@Western
op_collection_id ftunivwestonta
language unknown
topic Structural Engineering
spellingShingle Structural Engineering
Neilson, David A.
Burmey, Darren
Loptson, Scott
STR-814: LESSONS LEARNED FROM THE NAIRN AVENUE OVERPASS CONCRETE GIRDER & PIER REPAIRS
topic_facet Structural Engineering
description The Nairn Avenue Overpass is a 213 m long, 11-span, 4-lane + sidewalk precast prestressed concrete I-girder bridge over the CP Keewatin Subdivision line in Winnipeg, MB. The superstructure consists of three continuous segments with deck joints at piers #3 and #8. The structure was built in 1967, and underwent major strengthening and rehabilitation of the deck, girders, and bearings in 1985. Piers consist of a cast-in-place pier cap approximately 18 m long supported on two cast-in-place columns approximately 7 to 8 m tall supported on concrete pile caps over timber raft-pile foundations. Leaking omega-style strip seal deck joints at Pier #3 and Pier #8 have exposed the piers and girder ends to chloride contaminated run-off from the deck. In 2002, the pier caps were re-faced on three sides and provided with galvanic anode cathodic protection, and the pier columns received local patch repairs only. In 2014, during a deck rehabilitation project that included rehabilitating the deck joints, Morrison Hershfield (the Consultant) noted significant deterioration of pier column concrete including staining, moderate-to-severe cracking and localized spalling. The Consultant was subsequently engaged by the City of Winnipeg (City) to conduct a field investigation to quantify the degree of deterioration, evaluate alternatives, and undertake design and construction administration of the preferred solution. This presentation describes these steps, and lessons learned from the Contractor, Consultant, and Owner’s perspective.
format Text
author Neilson, David A.
Burmey, Darren
Loptson, Scott
author_facet Neilson, David A.
Burmey, Darren
Loptson, Scott
author_sort Neilson, David A.
title STR-814: LESSONS LEARNED FROM THE NAIRN AVENUE OVERPASS CONCRETE GIRDER & PIER REPAIRS
title_short STR-814: LESSONS LEARNED FROM THE NAIRN AVENUE OVERPASS CONCRETE GIRDER & PIER REPAIRS
title_full STR-814: LESSONS LEARNED FROM THE NAIRN AVENUE OVERPASS CONCRETE GIRDER & PIER REPAIRS
title_fullStr STR-814: LESSONS LEARNED FROM THE NAIRN AVENUE OVERPASS CONCRETE GIRDER & PIER REPAIRS
title_full_unstemmed STR-814: LESSONS LEARNED FROM THE NAIRN AVENUE OVERPASS CONCRETE GIRDER & PIER REPAIRS
title_sort str-814: lessons learned from the nairn avenue overpass concrete girder & pier repairs
publisher Scholarship@Western
publishDate 2016
url https://ir.lib.uwo.ca/csce2016/London/Structural/8
https://ir.lib.uwo.ca/context/csce2016/article/1115/viewcontent/STR_814.pdf
long_lat ENVELOPE(-63.533,-63.533,-66.167,-66.167)
geographic Morrison
geographic_facet Morrison
genre Keewatin
genre_facet Keewatin
op_source Canadian Society for Civil Engineering
op_relation https://ir.lib.uwo.ca/csce2016/London/Structural/8
https://ir.lib.uwo.ca/context/csce2016/article/1115/viewcontent/STR_814.pdf
_version_ 1778528118670098432