Adding Spillways Capacity to Existing Dams
Canadian Electrical Association, Spring Conference This short paper discusses the work required to build a new side channel, stoplog-controlled spillway at Gull Pond, Newfoundland; the advantages of "trigger" stoplog release mechanisms; the addition of spill capacity by means of an overflo...
Main Author: | |
---|---|
Format: | Other/Unknown Material |
Language: | English |
Published: |
University of Toronto
1993
|
Subjects: | |
Online Access: | http://hdl.handle.net/1807/109585 |
Summary: | Canadian Electrical Association, Spring Conference This short paper discusses the work required to build a new side channel, stoplog-controlled spillway at Gull Pond, Newfoundland; the advantages of "trigger" stoplog release mechanisms; the addition of spill capacity by means of an overflow side channel concrete spillway at Bearspaw in Alberta; the complete rebuilding and enlargement of the crest spillway at the Ghost Dam, Alberta. |
---|