Beluga Coal Gasification - ISER
ISER was requested to conduct an economic analysis of a possible 'Cook Inlet Syngas Pipeline'. The economic analysis was incorporated as section 7.4 of the larger report titled: 'Beluga Coal Gasification Feasibility Study, DOE/NETL-2006/1248, Phase 2 Final Report, October 2006, for Su...
Main Author: | |
---|---|
Other Authors: | |
Format: | Report |
Language: | English |
Published: |
University of Alaska
2008
|
Subjects: | |
Online Access: | https://doi.org/10.2172/963355 https://digital.library.unt.edu/ark:/67531/metadc934929/ |
_version_ | 1821868352338919424 |
---|---|
author | Colt, Steve |
author2 | United States. Department of Energy. |
author_facet | Colt, Steve |
author_sort | Colt, Steve |
collection | University of North Texas: UNT Digital Library |
description | ISER was requested to conduct an economic analysis of a possible 'Cook Inlet Syngas Pipeline'. The economic analysis was incorporated as section 7.4 of the larger report titled: 'Beluga Coal Gasification Feasibility Study, DOE/NETL-2006/1248, Phase 2 Final Report, October 2006, for Subtask 41817.333.01.01'. The pipeline would carry CO{sub 2} and N{sub 2}-H{sub 2} from a synthetic gas plant on the western side of Cook Inlet to Agrium's facility. The economic analysis determined that the net present value of the total capital and operating lifecycle costs for the pipeline ranges from $318 to $588 million. The greatest contributor to this spread is the cost of electricity, which ranges from $0.05 to $0.10/kWh in this analysis. The financial analysis shows that the delivery cost of gas may range from $0.33 to $0.55/Mcf in the first year depending primarily on the price for electricity. |
format | Report |
genre | Beluga Beluga* Alaska |
genre_facet | Beluga Beluga* Alaska |
geographic | Gulf of Alaska |
geographic_facet | Gulf of Alaska |
id | ftunivnotexas:info:ark/67531/metadc934929 |
institution | Open Polar |
language | English |
op_collection_id | ftunivnotexas |
op_doi | https://doi.org/10.2172/963355 |
op_relation | grantno: FC26-01NT41248 doi:10.2172/963355 osti: 963355 https://digital.library.unt.edu/ark:/67531/metadc934929/ ark: ark:/67531/metadc934929 |
publishDate | 2008 |
publisher | University of Alaska |
record_format | openpolar |
spelling | ftunivnotexas:info:ark/67531/metadc934929 2025-01-16T21:15:10+00:00 Beluga Coal Gasification - ISER Colt, Steve United States. Department of Energy. 2008-12-31 Text https://doi.org/10.2172/963355 https://digital.library.unt.edu/ark:/67531/metadc934929/ English eng University of Alaska grantno: FC26-01NT41248 doi:10.2172/963355 osti: 963355 https://digital.library.unt.edu/ark:/67531/metadc934929/ ark: ark:/67531/metadc934929 Coal Gasification Pipelines 01 Coal Lignite And Peat Gulf Of Alaska Electricity Economic Analysis Capital Prices Report 2008 ftunivnotexas https://doi.org/10.2172/963355 2019-05-18T22:08:18Z ISER was requested to conduct an economic analysis of a possible 'Cook Inlet Syngas Pipeline'. The economic analysis was incorporated as section 7.4 of the larger report titled: 'Beluga Coal Gasification Feasibility Study, DOE/NETL-2006/1248, Phase 2 Final Report, October 2006, for Subtask 41817.333.01.01'. The pipeline would carry CO{sub 2} and N{sub 2}-H{sub 2} from a synthetic gas plant on the western side of Cook Inlet to Agrium's facility. The economic analysis determined that the net present value of the total capital and operating lifecycle costs for the pipeline ranges from $318 to $588 million. The greatest contributor to this spread is the cost of electricity, which ranges from $0.05 to $0.10/kWh in this analysis. The financial analysis shows that the delivery cost of gas may range from $0.33 to $0.55/Mcf in the first year depending primarily on the price for electricity. Report Beluga Beluga* Alaska University of North Texas: UNT Digital Library Gulf of Alaska |
spellingShingle | Coal Gasification Pipelines 01 Coal Lignite And Peat Gulf Of Alaska Electricity Economic Analysis Capital Prices Colt, Steve Beluga Coal Gasification - ISER |
title | Beluga Coal Gasification - ISER |
title_full | Beluga Coal Gasification - ISER |
title_fullStr | Beluga Coal Gasification - ISER |
title_full_unstemmed | Beluga Coal Gasification - ISER |
title_short | Beluga Coal Gasification - ISER |
title_sort | beluga coal gasification - iser |
topic | Coal Gasification Pipelines 01 Coal Lignite And Peat Gulf Of Alaska Electricity Economic Analysis Capital Prices |
topic_facet | Coal Gasification Pipelines 01 Coal Lignite And Peat Gulf Of Alaska Electricity Economic Analysis Capital Prices |
url | https://doi.org/10.2172/963355 https://digital.library.unt.edu/ark:/67531/metadc934929/ |