Study of Remote Military Power Applications: Report 4, Thule Air Base, Greenland
From introduction: The study is essentially an economic evaluation of the construction and operation of nuclear power plants at several designated military installations where increased power generating capabilities of 5 to 40 mwe may be required by the Government during the period 1963 through 1970...
Other Authors: | , |
---|---|
Format: | Report |
Language: | English |
Published: |
Henry J. Kaiser Company
1960
|
Subjects: | |
Online Access: | http://digital.library.unt.edu/ark:/67531/metadc502703/ |
Summary: | From introduction: The study is essentially an economic evaluation of the construction and operation of nuclear power plants at several designated military installations where increased power generating capabilities of 5 to 40 mwe may be required by the Government during the period 1963 through 1970. |
---|