Factors hindering the development of small-scale municipal hydropower: a case study of the Black River project in Springfield, Vermont

There are many good reasons to use New England's small-scale hydropower resources to generate electricity. But current production capacity in the three northern states is only 1300 MW, just 35% of the 3710 MW estimated to be available to the states. Though the benefits of properly designed proj...

Full description

Bibliographic Details
Main Authors: Peters, E., Berger, G., Amlin, J., Meadows, D.
Format: Report
Language:English
Published: Dartmouth Coll., Hanover, NH (USA). Thayer School of Engineering 1979
Subjects:
Online Access:https://doi.org/10.2172/6618265
https://digital.library.unt.edu/ark:/67531/metadc1186828/