Feasibility study for low-head hydropower on the Mill River, Northampton, Massachusetts

Five existing dams along a 6.5-mile reach of the Mill River in the City of Northampton, Massachusetts were studied to assess the feasibility of developing the sites for low-head hydroelectric power generation. Each of the dams was inspected to evaluate existing conditions and necessary work required...

Full description

Bibliographic Details
Format: Report
Language:English
Published: Curran Associates, Inc., Northampton, MA (USA) 1979
Subjects:
Online Access:https://doi.org/10.2172/5766688
https://digital.library.unt.edu/ark:/67531/metadc1098931/