id ftunivnotexas:info:ark/67531/metadc1097539
record_format openpolar
spelling ftunivnotexas:info:ark/67531/metadc1097539 2023-05-15T15:48:57+02:00 Wildlife Impact Assessment : Bonneville, McNary, The Dalles, and John Day Projects. Rasmussen, Larry Wright, Patrick United States. Bonneville Power Administration. 1990-10-01 185 pages Text https://doi.org/10.2172/5782154 https://digital.library.unt.edu/ark:/67531/metadc1097539/ English eng U.S. Fish and Wildlife Service other: DE91013706 rep-no: DOE/BP-92430-1 grantno: AI79-87BP35261 doi:10.2172/5782154 osti: 5782154 https://digital.library.unt.edu/ark:/67531/metadc1097539/ ark: ark:/67531/metadc1097539 Progress Report Oregon Construction Plants 54 Environmental Sciences 540350 -- Environment Aquatic-- Site Resource & Use Studies-- (1990-) Power Plants Hydroelectric Power Plants Animals Habitat 13 Hydro Energy Wild Animals Biological Effects 130800 -- Hydro Energy-- Health & Safety-- (1990-) Bonneville Power Administration Columbia River Basin Fowl Energy Source Development Washington Us Organizations Operation Document Types Habitat (Ecology) - Columbia River - Modification Birds National Organizations Federal Region X Us Doe Dams Environmental Impacts Vertebrates Habitat (Ecology) - Columbia River - Modification 130600* -- Hydro Energy-- Environmental Aspects Mitigation North America Usa Developed Countries Report 1990 ftunivnotexas https://doi.org/10.2172/5782154 2022-07-09T22:08:03Z The Habitat Evaluation Procedures (HEP) were used to evaluate pre- and post-construction habitat conditions of the US Army Corps of Engineers Bonneville project in Oregon and Washington. The project directly impacted 20,749 acres of wildlife habitat. Seven evaluation species were selected with losses and gains expressed in Habitat Units (HU's). One HU is equivalent to 1 acre of prime habitat. The evaluation estimated a gain of 2671 HU's of lesser scaup wintering habitat. Losses of 4300 HU's of great blue heron habitat, 2443 HU's of Canada goose habitat, 2767 HU's of spotted sandpiper habitat, 163 HU's of yellow warbler habitat, 1022 HU's black-capped chickadee habitat, and 1622 HU's of mink habitat occurred as a result of the project. This amounts to a total combined loss of 12,317 HU's. 18 refs., 1 fig., 4 tabs. Report Canada Goose University of North Texas: UNT Digital Library Canada
institution Open Polar
collection University of North Texas: UNT Digital Library
op_collection_id ftunivnotexas
language English
topic Progress Report
Oregon
Construction
Plants
54 Environmental Sciences
540350 -- Environment
Aquatic-- Site Resource & Use Studies-- (1990-)
Power Plants
Hydroelectric Power Plants
Animals
Habitat
13 Hydro Energy
Wild Animals
Biological Effects
130800 -- Hydro Energy-- Health & Safety-- (1990-)
Bonneville Power Administration
Columbia River Basin
Fowl
Energy Source Development
Washington
Us Organizations
Operation
Document Types
Habitat (Ecology) - Columbia River - Modification
Birds
National Organizations
Federal Region X
Us Doe
Dams
Environmental Impacts
Vertebrates Habitat (Ecology) - Columbia River - Modification 130600* -- Hydro Energy-- Environmental Aspects
Mitigation
North America
Usa
Developed Countries
spellingShingle Progress Report
Oregon
Construction
Plants
54 Environmental Sciences
540350 -- Environment
Aquatic-- Site Resource & Use Studies-- (1990-)
Power Plants
Hydroelectric Power Plants
Animals
Habitat
13 Hydro Energy
Wild Animals
Biological Effects
130800 -- Hydro Energy-- Health & Safety-- (1990-)
Bonneville Power Administration
Columbia River Basin
Fowl
Energy Source Development
Washington
Us Organizations
Operation
Document Types
Habitat (Ecology) - Columbia River - Modification
Birds
National Organizations
Federal Region X
Us Doe
Dams
Environmental Impacts
Vertebrates Habitat (Ecology) - Columbia River - Modification 130600* -- Hydro Energy-- Environmental Aspects
Mitigation
North America
Usa
Developed Countries
Rasmussen, Larry
Wright, Patrick
Wildlife Impact Assessment : Bonneville, McNary, The Dalles, and John Day Projects.
topic_facet Progress Report
Oregon
Construction
Plants
54 Environmental Sciences
540350 -- Environment
Aquatic-- Site Resource & Use Studies-- (1990-)
Power Plants
Hydroelectric Power Plants
Animals
Habitat
13 Hydro Energy
Wild Animals
Biological Effects
130800 -- Hydro Energy-- Health & Safety-- (1990-)
Bonneville Power Administration
Columbia River Basin
Fowl
Energy Source Development
Washington
Us Organizations
Operation
Document Types
Habitat (Ecology) - Columbia River - Modification
Birds
National Organizations
Federal Region X
Us Doe
Dams
Environmental Impacts
Vertebrates Habitat (Ecology) - Columbia River - Modification 130600* -- Hydro Energy-- Environmental Aspects
Mitigation
North America
Usa
Developed Countries
description The Habitat Evaluation Procedures (HEP) were used to evaluate pre- and post-construction habitat conditions of the US Army Corps of Engineers Bonneville project in Oregon and Washington. The project directly impacted 20,749 acres of wildlife habitat. Seven evaluation species were selected with losses and gains expressed in Habitat Units (HU's). One HU is equivalent to 1 acre of prime habitat. The evaluation estimated a gain of 2671 HU's of lesser scaup wintering habitat. Losses of 4300 HU's of great blue heron habitat, 2443 HU's of Canada goose habitat, 2767 HU's of spotted sandpiper habitat, 163 HU's of yellow warbler habitat, 1022 HU's black-capped chickadee habitat, and 1622 HU's of mink habitat occurred as a result of the project. This amounts to a total combined loss of 12,317 HU's. 18 refs., 1 fig., 4 tabs.
author2 United States. Bonneville Power Administration.
format Report
author Rasmussen, Larry
Wright, Patrick
author_facet Rasmussen, Larry
Wright, Patrick
author_sort Rasmussen, Larry
title Wildlife Impact Assessment : Bonneville, McNary, The Dalles, and John Day Projects.
title_short Wildlife Impact Assessment : Bonneville, McNary, The Dalles, and John Day Projects.
title_full Wildlife Impact Assessment : Bonneville, McNary, The Dalles, and John Day Projects.
title_fullStr Wildlife Impact Assessment : Bonneville, McNary, The Dalles, and John Day Projects.
title_full_unstemmed Wildlife Impact Assessment : Bonneville, McNary, The Dalles, and John Day Projects.
title_sort wildlife impact assessment : bonneville, mcnary, the dalles, and john day projects.
publisher U.S. Fish and Wildlife Service
publishDate 1990
url https://doi.org/10.2172/5782154
https://digital.library.unt.edu/ark:/67531/metadc1097539/
geographic Canada
geographic_facet Canada
genre Canada Goose
genre_facet Canada Goose
op_relation other: DE91013706
rep-no: DOE/BP-92430-1
grantno: AI79-87BP35261
doi:10.2172/5782154
osti: 5782154
https://digital.library.unt.edu/ark:/67531/metadc1097539/
ark: ark:/67531/metadc1097539
op_doi https://doi.org/10.2172/5782154
_version_ 1766384038482804736