Polonsky, R. (1979). Feasibility determination of low-head hydroelectric power development at existing sites. Final report. Bethlehem Mink Farm, Littleton, OH (USA).
Chicago Style (17th ed.) CitationPolonsky, R. Feasibility Determination of Low-head Hydroelectric Power Development at Existing Sites. Final Report. Bethlehem Mink Farm, Littleton, OH (USA), 1979.
MLA (9th ed.) CitationPolonsky, R. Feasibility Determination of Low-head Hydroelectric Power Development at Existing Sites. Final Report. Bethlehem Mink Farm, Littleton, OH (USA), 1979.
Warning: These citations may not always be 100% accurate.