1992 Evaluation of Downstream Fish Passage Facilities at the West Enfield Hydroelectric Project
None suppled. From background: The redevelopment of the West Enfield Hydroelectric Project (FERC No. 2600-027) was completed in the Fall of 1988 by Bangor-Pacific Hydro Associates. The Federal Energy Regulatory Commission, by order dated June 27, 1987 and amended by orders dated April 16, 1990, June...
Main Author: | |
---|---|
Format: | Text |
Language: | unknown |
Published: |
ScholarWorks@UMass Amherst
1993
|
Subjects: | |
Online Access: | https://scholarworks.umass.edu/fishpassage_unpublished_works/44 |
id |
ftunivmassamh:oai:scholarworks.umass.edu:fishpassage_unpublished_works-1043 |
---|---|
record_format |
openpolar |
spelling |
ftunivmassamh:oai:scholarworks.umass.edu:fishpassage_unpublished_works-1043 2023-05-15T15:30:44+02:00 1992 Evaluation of Downstream Fish Passage Facilities at the West Enfield Hydroelectric Project Bangor-Pacific Hydro Associates 1993-01-01T08:00:00Z https://scholarworks.umass.edu/fishpassage_unpublished_works/44 unknown ScholarWorks@UMass Amherst https://scholarworks.umass.edu/fishpassage_unpublished_works/44 Unpublished Works Atlantic salmon downstream fish passage fish passage hatchery smolts hydroelectric juvenile radio tags salmon smolt upstream weir West Enfield text 1993 ftunivmassamh 2022-01-09T19:17:03Z None suppled. From background: The redevelopment of the West Enfield Hydroelectric Project (FERC No. 2600-027) was completed in the Fall of 1988 by Bangor-Pacific Hydro Associates. The Federal Energy Regulatory Commission, by order dated June 27, 1987 and amended by orders dated April 16, 1990, June 11, 1991, and June 2, 1992, directed the licensee to evaluate the adequacy of the West Enfield Project upstream and downstream passage facilities. Only the passage of juvenile Atlantic salmon (smolt) was evaluated in this study. The smolt study focused on the project area but for practical purposes covered the entire main stem of the Penobscot from the release site to beyond the Veazie Dam 50 km downstream. Text Atlantic salmon University of Massachusetts: ScholarWorks@UMass Amherst Pacific Weir ENVELOPE(177.167,177.167,-84.983,-84.983) |
institution |
Open Polar |
collection |
University of Massachusetts: ScholarWorks@UMass Amherst |
op_collection_id |
ftunivmassamh |
language |
unknown |
topic |
Atlantic salmon downstream fish passage fish passage hatchery smolts hydroelectric juvenile radio tags salmon smolt upstream weir West Enfield |
spellingShingle |
Atlantic salmon downstream fish passage fish passage hatchery smolts hydroelectric juvenile radio tags salmon smolt upstream weir West Enfield Bangor-Pacific Hydro Associates 1992 Evaluation of Downstream Fish Passage Facilities at the West Enfield Hydroelectric Project |
topic_facet |
Atlantic salmon downstream fish passage fish passage hatchery smolts hydroelectric juvenile radio tags salmon smolt upstream weir West Enfield |
description |
None suppled. From background: The redevelopment of the West Enfield Hydroelectric Project (FERC No. 2600-027) was completed in the Fall of 1988 by Bangor-Pacific Hydro Associates. The Federal Energy Regulatory Commission, by order dated June 27, 1987 and amended by orders dated April 16, 1990, June 11, 1991, and June 2, 1992, directed the licensee to evaluate the adequacy of the West Enfield Project upstream and downstream passage facilities. Only the passage of juvenile Atlantic salmon (smolt) was evaluated in this study. The smolt study focused on the project area but for practical purposes covered the entire main stem of the Penobscot from the release site to beyond the Veazie Dam 50 km downstream. |
format |
Text |
author |
Bangor-Pacific Hydro Associates |
author_facet |
Bangor-Pacific Hydro Associates |
author_sort |
Bangor-Pacific Hydro Associates |
title |
1992 Evaluation of Downstream Fish Passage Facilities at the West Enfield Hydroelectric Project |
title_short |
1992 Evaluation of Downstream Fish Passage Facilities at the West Enfield Hydroelectric Project |
title_full |
1992 Evaluation of Downstream Fish Passage Facilities at the West Enfield Hydroelectric Project |
title_fullStr |
1992 Evaluation of Downstream Fish Passage Facilities at the West Enfield Hydroelectric Project |
title_full_unstemmed |
1992 Evaluation of Downstream Fish Passage Facilities at the West Enfield Hydroelectric Project |
title_sort |
1992 evaluation of downstream fish passage facilities at the west enfield hydroelectric project |
publisher |
ScholarWorks@UMass Amherst |
publishDate |
1993 |
url |
https://scholarworks.umass.edu/fishpassage_unpublished_works/44 |
long_lat |
ENVELOPE(177.167,177.167,-84.983,-84.983) |
geographic |
Pacific Weir |
geographic_facet |
Pacific Weir |
genre |
Atlantic salmon |
genre_facet |
Atlantic salmon |
op_source |
Unpublished Works |
op_relation |
https://scholarworks.umass.edu/fishpassage_unpublished_works/44 |
_version_ |
1766361185775517696 |