Hydroelectrical Generation Project for Northern Manitoba
The 1913 geological and environmental characteristic study that William McInnes carried out on the drainage basins of the Nelson and Churchill Rivers is considered to be one of the most significant studies which encouraged the province to explore its northern waters as a possible source of hydroelec...
Main Author: | |
---|---|
Format: | Other/Unknown Material |
Language: | English |
Published: |
2017
|
Subjects: | |
Online Access: | http://hdl.handle.net/1993/32157 |
id |
ftunivmanitoba:oai:mspace.lib.umanitoba.ca:1993/32157 |
---|---|
record_format |
openpolar |
spelling |
ftunivmanitoba:oai:mspace.lib.umanitoba.ca:1993/32157 2023-06-18T03:40:11+02:00 Hydroelectrical Generation Project for Northern Manitoba Grima, Victoria 2017-02 image/jpeg http://hdl.handle.net/1993/32157 eng eng http://hdl.handle.net/1993/32157 open access hydroelectric Manitoba water generating station HVDC Transmission System Lake Winnipeg regulation Churchill River Diversion bipole III transmission system Other 2017 ftunivmanitoba 2023-06-04T17:40:33Z The 1913 geological and environmental characteristic study that William McInnes carried out on the drainage basins of the Nelson and Churchill Rivers is considered to be one of the most significant studies which encouraged the province to explore its northern waters as a possible source of hydroelectric power. Thus, Manitoba's Crown Corporation, Manitoba Hydro, in the early 1960's began its venture in the execution and development of its Northern Hydro-electrical Generation Project. The Project focus is to fully harness the hydrological power of the Kache Sipi, the Nelson River, and by also supplementing it with a diversion of the Churchill River. This project is being accomplished through construction of hydroelectric generating stations and water level/flow regulatory infrastructure. To facilitate the transferring of the produced electrical power towards the southern section of the province, converter stations were constructed and High Voltage Direct Current transmission lines were also installed. Create H2O Program, University of Manitoba Other/Unknown Material Churchill Churchill River Nelson River MSpace at the University of Manitoba Sipi ENVELOPE(24.117,24.117,65.717,65.717) |
institution |
Open Polar |
collection |
MSpace at the University of Manitoba |
op_collection_id |
ftunivmanitoba |
language |
English |
topic |
hydroelectric Manitoba water generating station HVDC Transmission System Lake Winnipeg regulation Churchill River Diversion bipole III transmission system |
spellingShingle |
hydroelectric Manitoba water generating station HVDC Transmission System Lake Winnipeg regulation Churchill River Diversion bipole III transmission system Grima, Victoria Hydroelectrical Generation Project for Northern Manitoba |
topic_facet |
hydroelectric Manitoba water generating station HVDC Transmission System Lake Winnipeg regulation Churchill River Diversion bipole III transmission system |
description |
The 1913 geological and environmental characteristic study that William McInnes carried out on the drainage basins of the Nelson and Churchill Rivers is considered to be one of the most significant studies which encouraged the province to explore its northern waters as a possible source of hydroelectric power. Thus, Manitoba's Crown Corporation, Manitoba Hydro, in the early 1960's began its venture in the execution and development of its Northern Hydro-electrical Generation Project. The Project focus is to fully harness the hydrological power of the Kache Sipi, the Nelson River, and by also supplementing it with a diversion of the Churchill River. This project is being accomplished through construction of hydroelectric generating stations and water level/flow regulatory infrastructure. To facilitate the transferring of the produced electrical power towards the southern section of the province, converter stations were constructed and High Voltage Direct Current transmission lines were also installed. Create H2O Program, University of Manitoba |
format |
Other/Unknown Material |
author |
Grima, Victoria |
author_facet |
Grima, Victoria |
author_sort |
Grima, Victoria |
title |
Hydroelectrical Generation Project for Northern Manitoba |
title_short |
Hydroelectrical Generation Project for Northern Manitoba |
title_full |
Hydroelectrical Generation Project for Northern Manitoba |
title_fullStr |
Hydroelectrical Generation Project for Northern Manitoba |
title_full_unstemmed |
Hydroelectrical Generation Project for Northern Manitoba |
title_sort |
hydroelectrical generation project for northern manitoba |
publishDate |
2017 |
url |
http://hdl.handle.net/1993/32157 |
long_lat |
ENVELOPE(24.117,24.117,65.717,65.717) |
geographic |
Sipi |
geographic_facet |
Sipi |
genre |
Churchill Churchill River Nelson River |
genre_facet |
Churchill Churchill River Nelson River |
op_relation |
http://hdl.handle.net/1993/32157 |
op_rights |
open access |
_version_ |
1769005017937739776 |