A contribution to financial and geomechanical pit optimisation
Surface mine financial optimisation and geomechanical design are not well integrated. This paper presents a case study where both the net present value (NPV) and the design of slopes, for various ultimate pit scenarios, were assessed based on the geological block model. In the first stage, the stabi...
Main Authors: | , |
---|---|
Format: | Other/Unknown Material |
Language: | English |
Published: |
Reading Matrix
2020
|
Subjects: | |
Online Access: | https://hdl.handle.net/20.500.11794/38887 |
_version_ | 1830584814883831808 |
---|---|
author | Grenon, Martin Ngoma Bolusala, Christian |
author_facet | Grenon, Martin Ngoma Bolusala, Christian |
author_sort | Grenon, Martin |
collection | Université Laval: CorpusUL |
description | Surface mine financial optimisation and geomechanical design are not well integrated. This paper presents a case study where both the net present value (NPV) and the design of slopes, for various ultimate pit scenarios, were assessed based on the geological block model. In the first stage, the stability of the excavations was evaluated using limit equilibrium techniques. This resulted in the construction of susceptibility maps based on the factor of safety (FS) and the probability of failure (PF). The financial and geomechanical benefits associated with different scenarios were employed to arrive at an optimised design. |
format | Other/Unknown Material |
genre | Arctic Arctique* |
genre_facet | Arctic Arctique* |
geographic | Arctic |
geographic_facet | Arctic |
id | ftunivlavalcorp:oai:corpus.ulaval.ca:20.500.11794/38887 |
institution | Open Polar |
language | English |
op_collection_id | ftunivlavalcorp |
op_coverage | Arctique |
op_doi | https://doi.org/20.500.11794/38887 |
op_relation | https://hdl.handle.net/20.500.11794/38887 |
op_rights | http://purl.org/coar/access_right/c_16ec |
publishDate | 2020 |
publisher | Reading Matrix |
record_format | openpolar |
spelling | ftunivlavalcorp:oai:corpus.ulaval.ca:20.500.11794/38887 2025-04-27T14:24:30+00:00 A contribution to financial and geomechanical pit optimisation Grenon, Martin Ngoma Bolusala, Christian Arctique 2020-04-21T12:22:51Z application/pdf https://hdl.handle.net/20.500.11794/38887 eng eng Reading Matrix https://hdl.handle.net/20.500.11794/38887 http://purl.org/coar/access_right/c_16ec Open pit mining Arctic mining Slope design Ultimate pit Financial optimisation Mines -- Exploitation à ciel ouvert -- Aspect économique Mécanique des sols Pentes (Mécanique des sols) Mines -- Exploitation à ciel ouvert -- Productivité article dans une conférence COAR1_1::Texte::Contribution à une conférence::Actes de conférence::Article dans une conférence 2020 ftunivlavalcorp https://doi.org/20.500.11794/38887 2025-03-30T23:47:40Z Surface mine financial optimisation and geomechanical design are not well integrated. This paper presents a case study where both the net present value (NPV) and the design of slopes, for various ultimate pit scenarios, were assessed based on the geological block model. In the first stage, the stability of the excavations was evaluated using limit equilibrium techniques. This resulted in the construction of susceptibility maps based on the factor of safety (FS) and the probability of failure (PF). The financial and geomechanical benefits associated with different scenarios were employed to arrive at an optimised design. Other/Unknown Material Arctic Arctique* Université Laval: CorpusUL Arctic |
spellingShingle | Open pit mining Arctic mining Slope design Ultimate pit Financial optimisation Mines -- Exploitation à ciel ouvert -- Aspect économique Mécanique des sols Pentes (Mécanique des sols) Mines -- Exploitation à ciel ouvert -- Productivité Grenon, Martin Ngoma Bolusala, Christian A contribution to financial and geomechanical pit optimisation |
title | A contribution to financial and geomechanical pit optimisation |
title_full | A contribution to financial and geomechanical pit optimisation |
title_fullStr | A contribution to financial and geomechanical pit optimisation |
title_full_unstemmed | A contribution to financial and geomechanical pit optimisation |
title_short | A contribution to financial and geomechanical pit optimisation |
title_sort | contribution to financial and geomechanical pit optimisation |
topic | Open pit mining Arctic mining Slope design Ultimate pit Financial optimisation Mines -- Exploitation à ciel ouvert -- Aspect économique Mécanique des sols Pentes (Mécanique des sols) Mines -- Exploitation à ciel ouvert -- Productivité |
topic_facet | Open pit mining Arctic mining Slope design Ultimate pit Financial optimisation Mines -- Exploitation à ciel ouvert -- Aspect économique Mécanique des sols Pentes (Mécanique des sols) Mines -- Exploitation à ciel ouvert -- Productivité |
url | https://hdl.handle.net/20.500.11794/38887 |