Effects of clear-cutting and site preparation on water quality from a drained Scots pine mire in southern Finland

Ditch outflow from four treatment areas on a drained Scots pine mire was sampled for one year before and four years after clear-cutting and different site preparation operations. Ditch-mounding, or excavation of 40–60 cm deep ditches at spacings of 12–15 m in connection with mounding, is currently c...

Full description

Bibliographic Details
Main Author: Nieminen, M.
Format: Article in Journal/Newspaper
Language:English
Published: Boreal Environment Research Publishing Board 2024
Subjects:
Online Access:http://hdl.handle.net/10138/578185
_version_ 1821873833426026496
author Nieminen, M.
author_facet Nieminen, M.
author_sort Nieminen, M.
collection HELDA – University of Helsinki Open Repository
description Ditch outflow from four treatment areas on a drained Scots pine mire was sampled for one year before and four years after clear-cutting and different site preparation operations. Ditch-mounding, or excavation of 40–60 cm deep ditches at spacings of 12–15 m in connection with mounding, is currently considered the most reliable site preparation method for drained peatlands in Finland. High leaching rates of suspended solids were detected from the ditch-mounding area, where the ditches reached down into the mineral soil below peat layer. In contrast to clear-cutting + mounding (without ditches) and clear-cutting alone, cutting and ditch-mounding also increased the leaching of ammonium and nitrate. Phosphorus concentrations in ditch outflow following clear-cutting and site preparation increased from areas where peat contents of phosphorus sorbing minerals (aluminium and iron) were low. The study demonstrated that clear-cutting and site preparation can significantly impair water quality from drained low productive pine mires.
format Article in Journal/Newspaper
genre Boreal Environment Research
genre_facet Boreal Environment Research
id ftunivhelsihelda:oai:helda.helsinki.fi:10138/578185
institution Open Polar
language English
op_collection_id ftunivhelsihelda
op_relation Boreal Environment Research
1239-6095
1797-2469
1
8
http://hdl.handle.net/10138/578185
Suomen ympäristökeskus
op_rights CC BY 4.0
openAccess
publishDate 2024
publisher Boreal Environment Research Publishing Board
record_format openpolar
spelling ftunivhelsihelda:oai:helda.helsinki.fi:10138/578185 2025-01-16T21:20:05+00:00 Effects of clear-cutting and site preparation on water quality from a drained Scots pine mire in southern Finland Nieminen, M. 2024-06-27T13:44:48Z 53-59 application/pdf http://hdl.handle.net/10138/578185 eng eng Boreal Environment Research Publishing Board Boreal Environment Research 1239-6095 1797-2469 1 8 http://hdl.handle.net/10138/578185 Suomen ympäristökeskus CC BY 4.0 openAccess Artikkeli lehdessä 2024 ftunivhelsihelda 2024-08-21T23:48:04Z Ditch outflow from four treatment areas on a drained Scots pine mire was sampled for one year before and four years after clear-cutting and different site preparation operations. Ditch-mounding, or excavation of 40–60 cm deep ditches at spacings of 12–15 m in connection with mounding, is currently considered the most reliable site preparation method for drained peatlands in Finland. High leaching rates of suspended solids were detected from the ditch-mounding area, where the ditches reached down into the mineral soil below peat layer. In contrast to clear-cutting + mounding (without ditches) and clear-cutting alone, cutting and ditch-mounding also increased the leaching of ammonium and nitrate. Phosphorus concentrations in ditch outflow following clear-cutting and site preparation increased from areas where peat contents of phosphorus sorbing minerals (aluminium and iron) were low. The study demonstrated that clear-cutting and site preparation can significantly impair water quality from drained low productive pine mires. Article in Journal/Newspaper Boreal Environment Research HELDA – University of Helsinki Open Repository
spellingShingle Nieminen, M.
Effects of clear-cutting and site preparation on water quality from a drained Scots pine mire in southern Finland
title Effects of clear-cutting and site preparation on water quality from a drained Scots pine mire in southern Finland
title_full Effects of clear-cutting and site preparation on water quality from a drained Scots pine mire in southern Finland
title_fullStr Effects of clear-cutting and site preparation on water quality from a drained Scots pine mire in southern Finland
title_full_unstemmed Effects of clear-cutting and site preparation on water quality from a drained Scots pine mire in southern Finland
title_short Effects of clear-cutting and site preparation on water quality from a drained Scots pine mire in southern Finland
title_sort effects of clear-cutting and site preparation on water quality from a drained scots pine mire in southern finland
url http://hdl.handle.net/10138/578185