Val av prioriterade korridorer för Norrbotniabanan med hjälp av Multikriteriaanalys
Choosing alternative corridors for the Norrbotniabanan by the use of Multi-Criteria Analysis During 2002-2003 a pre-feasibility study of a possible Norrbotnia railway is conducted. Norrbotniabanan is a new coastal railway, between Umeå-Luleå-Haparanda, in total some 400 km of line. An important part...
Main Authors: | , , , , |
---|---|
Format: | Conference Object |
Language: | Swedish |
Published: |
Luleå tekniska universitet
2003
|
Subjects: | |
Online Access: | http://urn.kb.se/resolve?urn=urn:nbn:se:du-38034 |
id |
ftunivdalarna:oai:DiVA.org:du-38034 |
---|---|
record_format |
openpolar |
spelling |
ftunivdalarna:oai:DiVA.org:du-38034 2023-10-29T02:36:51+01:00 Val av prioriterade korridorer för Norrbotniabanan med hjälp av Multikriteriaanalys Berggård, Glenn Goldbach, Stine Gissel Hansen, Sten Ranhagen, Ulf Sewring, Göran 2003 application/pdf http://urn.kb.se/resolve?urn=urn:nbn:se:du-38034 swe swe Luleå tekniska universitet Atkins Danmark A/S FFNS AB; Luleå tekniska universitet; Sweco Tyrèns Infrakonsult AB Linköping Transportforum 2003 : Rapportsammanställning av föredrag i Linköping 8–9 januari 2003 http://urn.kb.se/resolve?urn=urn:nbn:se:du-38034 info:eu-repo/semantics/openAccess Other Civil Engineering Annan samhällsbyggnadsteknik Environmental Analysis and Construction Information Technology Miljöanalys och bygginformationsteknik Conference paper info:eu-repo/semantics/conferenceObject text 2003 ftunivdalarna 2023-09-29T14:55:33Z Choosing alternative corridors for the Norrbotniabanan by the use of Multi-Criteria Analysis During 2002-2003 a pre-feasibility study of a possible Norrbotnia railway is conducted. Norrbotniabanan is a new coastal railway, between Umeå-Luleå-Haparanda, in total some 400 km of line. An important part of this study is to identify potential corridors and select corridors for further investigation. This is done in a dialogue with local authorities throughout the study. Due to the number of possible corridors and possible combinations along the line Umeå - Robertsfors – Skellefteå – Piteå – Luleå – Boden – Kalix - Haparanda the final number of alternatives is quite large. In general choosing some ”best” alternative is not an easy task, when many alternatives occur. Many effects have to be taken into account e.g. construction cost, time savings, various impacts on environment etc. Many of these impacts cannot easily be incorporated into a traditional cost-benefit analysis, nevertheless they play an important role in decision making. Multi Criteria Analysis (MCA) is a suitable decision aid tool in such a planning situation. As part of the Norrbotniabana study a simple MCA was carried out. A set of criteria for selecting alternatives was identified. At a seminar with participants from regional and local planning authorities and other interested parties, these criteria were evaluated for each alternative on a simple score from 1-5. Afterwards the relative importance of each criteria was estimated. This was done in groups. The consequences of these scores and weights were then analysed in the PC-tool Decision Criterium Plus. The presentation will report the results of the Multi Criteria Analysis and comment on the lessons learned from the practical use of MCA in the planning process. During 2002-2003 a pre-feasibility study of a possible Norrbotnia railway is conducted. Norrbotniabanan is a new coastal railway, between Umeå-Luleå-Haparanda, in total some 400 km of line. An important part of this study is to identify ... Conference Object Haparanda Luleå Luleå Luleå Piteå Dalarna University: Publications (DiVA) |
institution |
Open Polar |
collection |
Dalarna University: Publications (DiVA) |
op_collection_id |
ftunivdalarna |
language |
Swedish |
topic |
Other Civil Engineering Annan samhällsbyggnadsteknik Environmental Analysis and Construction Information Technology Miljöanalys och bygginformationsteknik |
spellingShingle |
Other Civil Engineering Annan samhällsbyggnadsteknik Environmental Analysis and Construction Information Technology Miljöanalys och bygginformationsteknik Berggård, Glenn Goldbach, Stine Gissel Hansen, Sten Ranhagen, Ulf Sewring, Göran Val av prioriterade korridorer för Norrbotniabanan med hjälp av Multikriteriaanalys |
topic_facet |
Other Civil Engineering Annan samhällsbyggnadsteknik Environmental Analysis and Construction Information Technology Miljöanalys och bygginformationsteknik |
description |
Choosing alternative corridors for the Norrbotniabanan by the use of Multi-Criteria Analysis During 2002-2003 a pre-feasibility study of a possible Norrbotnia railway is conducted. Norrbotniabanan is a new coastal railway, between Umeå-Luleå-Haparanda, in total some 400 km of line. An important part of this study is to identify potential corridors and select corridors for further investigation. This is done in a dialogue with local authorities throughout the study. Due to the number of possible corridors and possible combinations along the line Umeå - Robertsfors – Skellefteå – Piteå – Luleå – Boden – Kalix - Haparanda the final number of alternatives is quite large. In general choosing some ”best” alternative is not an easy task, when many alternatives occur. Many effects have to be taken into account e.g. construction cost, time savings, various impacts on environment etc. Many of these impacts cannot easily be incorporated into a traditional cost-benefit analysis, nevertheless they play an important role in decision making. Multi Criteria Analysis (MCA) is a suitable decision aid tool in such a planning situation. As part of the Norrbotniabana study a simple MCA was carried out. A set of criteria for selecting alternatives was identified. At a seminar with participants from regional and local planning authorities and other interested parties, these criteria were evaluated for each alternative on a simple score from 1-5. Afterwards the relative importance of each criteria was estimated. This was done in groups. The consequences of these scores and weights were then analysed in the PC-tool Decision Criterium Plus. The presentation will report the results of the Multi Criteria Analysis and comment on the lessons learned from the practical use of MCA in the planning process. During 2002-2003 a pre-feasibility study of a possible Norrbotnia railway is conducted. Norrbotniabanan is a new coastal railway, between Umeå-Luleå-Haparanda, in total some 400 km of line. An important part of this study is to identify ... |
format |
Conference Object |
author |
Berggård, Glenn Goldbach, Stine Gissel Hansen, Sten Ranhagen, Ulf Sewring, Göran |
author_facet |
Berggård, Glenn Goldbach, Stine Gissel Hansen, Sten Ranhagen, Ulf Sewring, Göran |
author_sort |
Berggård, Glenn |
title |
Val av prioriterade korridorer för Norrbotniabanan med hjälp av Multikriteriaanalys |
title_short |
Val av prioriterade korridorer för Norrbotniabanan med hjälp av Multikriteriaanalys |
title_full |
Val av prioriterade korridorer för Norrbotniabanan med hjälp av Multikriteriaanalys |
title_fullStr |
Val av prioriterade korridorer för Norrbotniabanan med hjälp av Multikriteriaanalys |
title_full_unstemmed |
Val av prioriterade korridorer för Norrbotniabanan med hjälp av Multikriteriaanalys |
title_sort |
val av prioriterade korridorer för norrbotniabanan med hjälp av multikriteriaanalys |
publisher |
Luleå tekniska universitet |
publishDate |
2003 |
url |
http://urn.kb.se/resolve?urn=urn:nbn:se:du-38034 |
genre |
Haparanda Luleå Luleå Luleå Piteå |
genre_facet |
Haparanda Luleå Luleå Luleå Piteå |
op_relation |
Transportforum 2003 : Rapportsammanställning av föredrag i Linköping 8–9 januari 2003 http://urn.kb.se/resolve?urn=urn:nbn:se:du-38034 |
op_rights |
info:eu-repo/semantics/openAccess |
_version_ |
1781061041089675264 |