Planning, construction and operational challenges of Suncor’s 1st sand dump

In 2009, Suncor Energy Inc.’s Oil Sands operation in Fort McMurray, AB, began the process of changing to a new technology for the treatment of the tailings streams coming from their water-based extraction process. This new treatment, known collectively as Tailings Reduction Operations (TRO™), is bas...

Full description

Bibliographic Details
Main Author: Ali, Zulfiqar
Other Authors: Tailings and Mine Waste Conference (2011 : Vancouver, B.C.), University of British Columbia. Norman B. Keevil Institute of Mining Engineering
Format: Conference Object
Language:English
Published: 2011
Subjects:
Online Access:http://hdl.handle.net/2429/37949
id ftunivbritcolcir:oai:circle.library.ubc.ca:2429/37949
record_format openpolar
spelling ftunivbritcolcir:oai:circle.library.ubc.ca:2429/37949 2023-05-15T16:17:38+02:00 Planning, construction and operational challenges of Suncor’s 1st sand dump Ali, Zulfiqar Tailings and Mine Waste Conference (2011 : Vancouver, B.C.) University of British Columbia. Norman B. Keevil Institute of Mining Engineering 2011-11-04 http://hdl.handle.net/2429/37949 eng eng Attribution-NonCommercial-NoDerivatives 4.0 International http://creativecommons.org/licenses/by-nc-nd/4.0/ CC-BY-NC-ND Text Conference Paper 2011 ftunivbritcolcir 2019-10-15T18:06:17Z In 2009, Suncor Energy Inc.’s Oil Sands operation in Fort McMurray, AB, began the process of changing to a new technology for the treatment of the tailings streams coming from their water-based extraction process. This new treatment, known collectively as Tailings Reduction Operations (TRO™), is based on two primary technologies: Mature fine tailings (MFT) drying, and the construction of elevated and draining sand dumps. Most of the public information on TRO™ has been focused on the MFT drying components, with less attention paid to the technically simpler but operationally complex systems required to build stacks of tailings sand contained within sand dykes at the rates required to sustain production. This paper discusses the planning and operational challenges of constructing the sand dump rising at the rate of 20 meters per year while maintaining continuous oil sands production and structural integrity of the dump. [All papers were considered for technical and language appropriateness by the organizing committee.] Non UBC Unreviewed Other Conference Object Fort McMurray University of British Columbia: cIRcle - UBC's Information Repository Fort McMurray
institution Open Polar
collection University of British Columbia: cIRcle - UBC's Information Repository
op_collection_id ftunivbritcolcir
language English
description In 2009, Suncor Energy Inc.’s Oil Sands operation in Fort McMurray, AB, began the process of changing to a new technology for the treatment of the tailings streams coming from their water-based extraction process. This new treatment, known collectively as Tailings Reduction Operations (TRO™), is based on two primary technologies: Mature fine tailings (MFT) drying, and the construction of elevated and draining sand dumps. Most of the public information on TRO™ has been focused on the MFT drying components, with less attention paid to the technically simpler but operationally complex systems required to build stacks of tailings sand contained within sand dykes at the rates required to sustain production. This paper discusses the planning and operational challenges of constructing the sand dump rising at the rate of 20 meters per year while maintaining continuous oil sands production and structural integrity of the dump. [All papers were considered for technical and language appropriateness by the organizing committee.] Non UBC Unreviewed Other
author2 Tailings and Mine Waste Conference (2011 : Vancouver, B.C.)
University of British Columbia. Norman B. Keevil Institute of Mining Engineering
format Conference Object
author Ali, Zulfiqar
spellingShingle Ali, Zulfiqar
Planning, construction and operational challenges of Suncor’s 1st sand dump
author_facet Ali, Zulfiqar
author_sort Ali, Zulfiqar
title Planning, construction and operational challenges of Suncor’s 1st sand dump
title_short Planning, construction and operational challenges of Suncor’s 1st sand dump
title_full Planning, construction and operational challenges of Suncor’s 1st sand dump
title_fullStr Planning, construction and operational challenges of Suncor’s 1st sand dump
title_full_unstemmed Planning, construction and operational challenges of Suncor’s 1st sand dump
title_sort planning, construction and operational challenges of suncor’s 1st sand dump
publishDate 2011
url http://hdl.handle.net/2429/37949
geographic Fort McMurray
geographic_facet Fort McMurray
genre Fort McMurray
genre_facet Fort McMurray
op_rights Attribution-NonCommercial-NoDerivatives 4.0 International
http://creativecommons.org/licenses/by-nc-nd/4.0/
op_rightsnorm CC-BY-NC-ND
_version_ 1766003523254747136