Prudhoe Bay West End gas lift supply optimization

Master's Project (M.S.) University of Alaska Fairbanks, 2019 The western extension of Alaska's Prudhoe Bay, known collectively as Eileen West End (EWE), operates under a gas lift pressure supply constraint. This constraint is largely contributed by two factors: the extensively long gas lif...

Full description

Bibliographic Details
Main Author: Chou, Irwin
Other Authors: Dandekar, Abhijit, Ning, Samson, Zhang, Yin
Format: Other/Unknown Material
Language:English
Published: 2019
Subjects:
Online Access:http://hdl.handle.net/11122/10969
id ftunivalaska:oai:scholarworks.alaska.edu:11122/10969
record_format openpolar
spelling ftunivalaska:oai:scholarworks.alaska.edu:11122/10969 2023-05-15T18:03:38+02:00 Prudhoe Bay West End gas lift supply optimization Chou, Irwin Dandekar, Abhijit Ning, Samson Zhang, Yin 2019-12 http://hdl.handle.net/11122/10969 en_US eng http://hdl.handle.net/11122/10969 Department of Petroleum Engineering Master's Project ms 2019 ftunivalaska 2023-02-23T21:37:35Z Master's Project (M.S.) University of Alaska Fairbanks, 2019 The western extension of Alaska's Prudhoe Bay, known collectively as Eileen West End (EWE), operates under a gas lift pressure supply constraint. This constraint is largely contributed by two factors: the extensively long gas lift supply line that stretches across the western field and the large number of production wells offtaking gas lift to stay online or enhance production. The gas lift supply line is approximately 18.5 miles long and provides gas lift to 200+ production wells. This results in a pressure drop severe enough to start hindering production on the western most side of the field as low gas lift supply pressure can cause unstable production, reduced production rate, or stop production altogether. Theory suggests that boosting the system's gas lift supply pressure will improve production from the field. In order to quantify the benefit of boosting the gas lift supply pressure and determine the most optimal way to do so, an industry proven physics based multiphase flow simulator was used to construct two models, a production system and a gas lift system. This dual integrated model approach enabled the ability to capture and predict production effects caused by changes in gas lift supply pressure and determine if boosting the pressure will be beneficial from an operator standpoint. The objective of this project is to describe how building an integrated production model can capture and quantify changes in production for a very large and complex interconnected system. Applying these types of models can help steer important operational and economic decisions to minimize risk and expense as an operator. Using the models, several scenarios were evaluated to determine and quantify the most optimal approach to address the low gas lift supply in EWE. It was determined that shutting in the least competitive wells to boost the gas lift supply pressure was the best scenario to implement for several reasons: the scenario still yielded a high ... Other/Unknown Material Prudhoe Bay Alaska University of Alaska: ScholarWorks@UA Fairbanks
institution Open Polar
collection University of Alaska: ScholarWorks@UA
op_collection_id ftunivalaska
language English
description Master's Project (M.S.) University of Alaska Fairbanks, 2019 The western extension of Alaska's Prudhoe Bay, known collectively as Eileen West End (EWE), operates under a gas lift pressure supply constraint. This constraint is largely contributed by two factors: the extensively long gas lift supply line that stretches across the western field and the large number of production wells offtaking gas lift to stay online or enhance production. The gas lift supply line is approximately 18.5 miles long and provides gas lift to 200+ production wells. This results in a pressure drop severe enough to start hindering production on the western most side of the field as low gas lift supply pressure can cause unstable production, reduced production rate, or stop production altogether. Theory suggests that boosting the system's gas lift supply pressure will improve production from the field. In order to quantify the benefit of boosting the gas lift supply pressure and determine the most optimal way to do so, an industry proven physics based multiphase flow simulator was used to construct two models, a production system and a gas lift system. This dual integrated model approach enabled the ability to capture and predict production effects caused by changes in gas lift supply pressure and determine if boosting the pressure will be beneficial from an operator standpoint. The objective of this project is to describe how building an integrated production model can capture and quantify changes in production for a very large and complex interconnected system. Applying these types of models can help steer important operational and economic decisions to minimize risk and expense as an operator. Using the models, several scenarios were evaluated to determine and quantify the most optimal approach to address the low gas lift supply in EWE. It was determined that shutting in the least competitive wells to boost the gas lift supply pressure was the best scenario to implement for several reasons: the scenario still yielded a high ...
author2 Dandekar, Abhijit
Ning, Samson
Zhang, Yin
format Other/Unknown Material
author Chou, Irwin
spellingShingle Chou, Irwin
Prudhoe Bay West End gas lift supply optimization
author_facet Chou, Irwin
author_sort Chou, Irwin
title Prudhoe Bay West End gas lift supply optimization
title_short Prudhoe Bay West End gas lift supply optimization
title_full Prudhoe Bay West End gas lift supply optimization
title_fullStr Prudhoe Bay West End gas lift supply optimization
title_full_unstemmed Prudhoe Bay West End gas lift supply optimization
title_sort prudhoe bay west end gas lift supply optimization
publishDate 2019
url http://hdl.handle.net/11122/10969
geographic Fairbanks
geographic_facet Fairbanks
genre Prudhoe Bay
Alaska
genre_facet Prudhoe Bay
Alaska
op_relation http://hdl.handle.net/11122/10969
Department of Petroleum Engineering
_version_ 1766174559543754752