Mooring Service Cruise (MSC) 2022: Cruise Report

The main objective of the cruise was to retrieve and deploy ocean moorings in the north-western Barents Sea and on the continental slope north of Kvitøya for the Nansen Legacy and A-TWAIN projects. A secondary objective was to perform hydrographic surveys in regions of Atlantic Water inflow and othe...

Full description

Bibliographic Details
Published in:The Nansen Legacy Report Series
Main Authors: Lundesgaard, Øyvind, Sundfjord, Arild, Sortland, Julie
Format: Article in Journal/Newspaper
Language:English
Published: Septentrio Academic Publishing 2023
Subjects:
Online Access:https://septentrio.uit.no/index.php/nansenlegacy/article/view/6977
https://doi.org/10.7557/nlrs.6977
Description
Summary:The main objective of the cruise was to retrieve and deploy ocean moorings in the north-western Barents Sea and on the continental slope north of Kvitøya for the Nansen Legacy and A-TWAIN projects. A secondary objective was to perform hydrographic surveys in regions of Atlantic Water inflow and other regions of interest. In addition, the cruise aided other research groups by deployment and recovery of minor equipment at sites along the cruise trajectory. In general, mooring operations were conducted during day hours, while nights were used to collect CTD data along various transects. Mooring work was completed quickly, efficiently, and ahead of schedule. This left ample time for additional pre-planned hydrographic surveys after the mooring work was complete. The cruise departed from Longyearbyen in the afternoon on 02.10.2022. An IMR ARGO float was deployed north of Spitsbergen the day after. On the following day, the ship operated for three days in the area around the A-TWAIN mooring array on the continental slope north of Kvitøya. Here, four moorings were recovered, and four were deployed, and hydrographic transects (CTDs) were conducted across the Atlantic Water inflow current and across northern Kvitøya Trough. After transiting south from the A-TWAIN area on the evening of 06.10.2022, another transect was conducted at night across the southern outlet of Kvitøya Trough. Mooring work began the following morning at the Nansen Legacy M1 location in the north-western Barents Sea. Two moorings were recovered and redeployed. Afterwards, a cross-slope transect was conducted intersecting the M1 mooring location. In the following days, consecutive transects were conducted into the through extending from M1 to Hartogbukta, along the Storisstraumen glacier front, from Storisstraumen southeast across the ocean basin, and along the bathymetric saddle west of Kong Karls Land. During the transit back north and west, an additional brief transect was conducted outward from Wahlenbergfjorden into the Hinlopen Trough, to obtain ...