TOSTI, G., BUSSO, M. M., Collaboration, I., Tosti, G., Busso, M. M., & I., C. (2003). IRAIT project: Future mid-IR operations at Dome C during summer.
Chicago Style (17th ed.) CitationTOSTI, Gino, Maurizio Maria BUSSO, I. Collaboration, Gino Tosti, Maurizio Maria Busso, and Collaboration I. IRAIT Project: Future Mid-IR Operations at Dome C During Summer. 2003.
MLA (9th ed.) CitationTOSTI, Gino, et al. IRAIT Project: Future Mid-IR Operations at Dome C During Summer. 2003.
Warning: These citations may not always be 100% accurate.