Final report : Contract AT(30-1)-3111 : Byrd Station Study /
". a study to reevaluate the PM-3B [Nuclear Power Plant] design and to develop a revised conceptual design for application at Byrd Station, Antarctica"--Page 1. ". a study to reevaluate the PM-3B [Nuclear Power Plant] design and to develop a revised conceptual design for application a...
Main Authors: | , |
---|---|
Format: | Text |
Language: | English |
Subjects: | |
Online Access: | http://hdl.handle.net/2027/mdp.39015095283431 |
Summary: | ". a study to reevaluate the PM-3B [Nuclear Power Plant] design and to develop a revised conceptual design for application at Byrd Station, Antarctica"--Page 1. ". a study to reevaluate the PM-3B [Nuclear Power Plant] design and to develop a revised conceptual design for application at Byrd Station, Antarctica"--Page 1. United States Atomic Energy Commission, New York Operations Office Mode of access: Internet. |
---|