Aitik mill as hub for a satellite mine: Preliminary development plan of a satellite copper deposit

The copper grade in the Aitik mine in northern Sweden is decreasing, therefore other deposits are investigated. One of these deposits is the satellite deposit discussed in this thesis. The grade of this deposit is higher than in Aitik and could thus be used to increase the copper production at the A...

Full description

Bibliographic Details
Main Author: Markesteijn, M. (author)
Other Authors: Benndorf, J. (mentor), Ngan-Tillard, D.J.M. (mentor)
Format: Bachelor Thesis
Language:English
Published: 2014
Subjects:
Online Access:http://resolver.tudelft.nl/uuid:717e96b3-7de0-4291-9a2c-0b8aae5eb019
id fttudelft:oai:tudelft.nl:uuid:717e96b3-7de0-4291-9a2c-0b8aae5eb019
record_format openpolar
spelling fttudelft:oai:tudelft.nl:uuid:717e96b3-7de0-4291-9a2c-0b8aae5eb019 2023-07-30T04:05:53+02:00 Aitik mill as hub for a satellite mine: Preliminary development plan of a satellite copper deposit Markesteijn, M. (author) Benndorf, J. (mentor) Ngan-Tillard, D.J.M. (mentor) 2014-07-24 http://resolver.tudelft.nl/uuid:717e96b3-7de0-4291-9a2c-0b8aae5eb019 en eng http://resolver.tudelft.nl/uuid:717e96b3-7de0-4291-9a2c-0b8aae5eb019 (c) 2014 Markesteijn, M. mining boliden mineral ab production schedule bachelor thesis Text 2014 fttudelft 2023-07-08T20:08:43Z The copper grade in the Aitik mine in northern Sweden is decreasing, therefore other deposits are investigated. One of these deposits is the satellite deposit discussed in this thesis. The grade of this deposit is higher than in Aitik and could thus be used to increase the copper production at the Aitik mine site. The goal of this thesis is to establish a preliminary development plan for a satellite copper deposit, which will be processed at the Aitik processing plant. A literature study showed that the geology of the Aitik mine is the same as that of the satellite mine. Therefore the same design properties could be used as in the Aitik mine. Because of the small surface operation and a steeply dipping ore, the best surface method for the satellite mine is an open-pit operation. The mine design will slightly differ from the Aitik design, the overall slope angle will be higher which results in less waste and thus less extracting costs. The overall slope could be made higher by a smaller bench width. Different cut-off values and elevations of the pit bottom are tried. The best result was obtained with an elevation of the pit bottom of 400 meters. This means that the pit will be 85 meters deep, since the average surface elevation is 485 meters. For the cut-off value is found that the best cut-off value is 55 SEK. This would result in a maximum profit. The fragmentation of the ore could best be done using a finer blasting schedule, instead of using an in-pit crusher. The costs of finer blasting is less than that of an in-pit crusher. The production schedule shows that the surface operation of this satellite mine will be from the $1^{st}$ of January 2018 to the $29^{th}$ of May 2024, this means that the open-pit mine will produce for just under 6,5 years. These dates are hypothetical and depend on the real starting date. After that a underground operation is considered. When this production schedule is used the Net Present Value of the project will be 59,9 MSEK. Therefore this project is economically profitable, ... Bachelor Thesis Northern Sweden Delft University of Technology: Institutional Repository
institution Open Polar
collection Delft University of Technology: Institutional Repository
op_collection_id fttudelft
language English
topic mining
boliden mineral ab
production schedule
spellingShingle mining
boliden mineral ab
production schedule
Markesteijn, M. (author)
Aitik mill as hub for a satellite mine: Preliminary development plan of a satellite copper deposit
topic_facet mining
boliden mineral ab
production schedule
description The copper grade in the Aitik mine in northern Sweden is decreasing, therefore other deposits are investigated. One of these deposits is the satellite deposit discussed in this thesis. The grade of this deposit is higher than in Aitik and could thus be used to increase the copper production at the Aitik mine site. The goal of this thesis is to establish a preliminary development plan for a satellite copper deposit, which will be processed at the Aitik processing plant. A literature study showed that the geology of the Aitik mine is the same as that of the satellite mine. Therefore the same design properties could be used as in the Aitik mine. Because of the small surface operation and a steeply dipping ore, the best surface method for the satellite mine is an open-pit operation. The mine design will slightly differ from the Aitik design, the overall slope angle will be higher which results in less waste and thus less extracting costs. The overall slope could be made higher by a smaller bench width. Different cut-off values and elevations of the pit bottom are tried. The best result was obtained with an elevation of the pit bottom of 400 meters. This means that the pit will be 85 meters deep, since the average surface elevation is 485 meters. For the cut-off value is found that the best cut-off value is 55 SEK. This would result in a maximum profit. The fragmentation of the ore could best be done using a finer blasting schedule, instead of using an in-pit crusher. The costs of finer blasting is less than that of an in-pit crusher. The production schedule shows that the surface operation of this satellite mine will be from the $1^{st}$ of January 2018 to the $29^{th}$ of May 2024, this means that the open-pit mine will produce for just under 6,5 years. These dates are hypothetical and depend on the real starting date. After that a underground operation is considered. When this production schedule is used the Net Present Value of the project will be 59,9 MSEK. Therefore this project is economically profitable, ...
author2 Benndorf, J. (mentor)
Ngan-Tillard, D.J.M. (mentor)
format Bachelor Thesis
author Markesteijn, M. (author)
author_facet Markesteijn, M. (author)
author_sort Markesteijn, M. (author)
title Aitik mill as hub for a satellite mine: Preliminary development plan of a satellite copper deposit
title_short Aitik mill as hub for a satellite mine: Preliminary development plan of a satellite copper deposit
title_full Aitik mill as hub for a satellite mine: Preliminary development plan of a satellite copper deposit
title_fullStr Aitik mill as hub for a satellite mine: Preliminary development plan of a satellite copper deposit
title_full_unstemmed Aitik mill as hub for a satellite mine: Preliminary development plan of a satellite copper deposit
title_sort aitik mill as hub for a satellite mine: preliminary development plan of a satellite copper deposit
publishDate 2014
url http://resolver.tudelft.nl/uuid:717e96b3-7de0-4291-9a2c-0b8aae5eb019
genre Northern Sweden
genre_facet Northern Sweden
op_relation http://resolver.tudelft.nl/uuid:717e96b3-7de0-4291-9a2c-0b8aae5eb019
op_rights (c) 2014 Markesteijn, M.
_version_ 1772818187816009728