Assessing Design Flows and Sediment Discharge on the Eastern Slopes

This document provides an evaluation of currently available rainfall runoff sediment production methodologies, identifies key parameters, and outlines field programs to gather data for model calibration. 1. RAINFALL RUNOFF There are two distinct requirements related to rainfall runoff. Firstly, the...

Full description

Bibliographic Details
Main Authors: Monenco Consultants Ltd., Hydrocon Engineering (Continental) Ltd.
Format: Other/Unknown Material
Language:English
Published: 1987
Subjects:
geo
Online Access:https://doi.org/10.7939/R3RV0D68T
https://era.library.ualberta.ca/items/3bfbf2c4-1662-46dc-b6bd-b3e3f77b85cd
id fttriple:oai:gotriple.eu:10670/1.13h5te
record_format openpolar
spelling fttriple:oai:gotriple.eu:10670/1.13h5te 2023-05-15T18:03:05+02:00 Assessing Design Flows and Sediment Discharge on the Eastern Slopes Monenco Consultants Ltd., Hydrocon Engineering (Continental) Ltd. 1987-01-01 https://doi.org/10.7939/R3RV0D68T https://era.library.ualberta.ca/items/3bfbf2c4-1662-46dc-b6bd-b3e3f77b85cd en eng doi:10.7939/R3RV0D68T 10670/1.13h5te https://era.library.ualberta.ca/items/3bfbf2c4-1662-46dc-b6bd-b3e3f77b85cd ERA : Education and Research Archive envir geo Other https://vocabularies.coar-repositories.org/resource_types/c_1843/ 1987 fttriple https://doi.org/10.7939/R3RV0D68T 2023-01-22T17:02:13Z This document provides an evaluation of currently available rainfall runoff sediment production methodologies, identifies key parameters, and outlines field programs to gather data for model calibration. 1. RAINFALL RUNOFF There are two distinct requirements related to rainfall runoff. Firstly, the entire runoff hydrograph must be determined to provide the hydraulic component for sedimentation pond design. Secondly, only the peak flood flow may be required for the design of ditches and culverts. For either case two separate components of the rainfall process must be described, namely the rainfall and runoff components. 2. SEDIMENT PRODUCTION There are two distinct data requirements related to sediment production. Firstly, there may be a need to develop the sediment graph (i.e., plot the time variation in runoff sediment concentration) associated with a design storm event at the pond inlet. This is required to determine the sediment removal efficiency of a given pond configuration during the specified design storm event. Secondly, the total amount of sediment delivered to the reservoir over the expected life of the reservoir may be estimated. This is required to size the sediment storage volume of an impoundment. 3. RECOMMENDED HYDROLOGIC/SEDIMENTOLOGIC MODEL It is recommended that an existing model be used, rather than designing a new one, because: 1. The development of a new watershed model would be time consuming and therefore, costly. 2. The resulting model would be an untried and untested technique. 3. There is no indication that a new watershed model would be better suited to Alberta conditions than some existing models. Other/Unknown Material Pond Inlet Unknown Pond Inlet ENVELOPE(-77.960,-77.960,72.699,72.699)
institution Open Polar
collection Unknown
op_collection_id fttriple
language English
topic envir
geo
spellingShingle envir
geo
Monenco Consultants Ltd.,
Hydrocon Engineering (Continental) Ltd.
Assessing Design Flows and Sediment Discharge on the Eastern Slopes
topic_facet envir
geo
description This document provides an evaluation of currently available rainfall runoff sediment production methodologies, identifies key parameters, and outlines field programs to gather data for model calibration. 1. RAINFALL RUNOFF There are two distinct requirements related to rainfall runoff. Firstly, the entire runoff hydrograph must be determined to provide the hydraulic component for sedimentation pond design. Secondly, only the peak flood flow may be required for the design of ditches and culverts. For either case two separate components of the rainfall process must be described, namely the rainfall and runoff components. 2. SEDIMENT PRODUCTION There are two distinct data requirements related to sediment production. Firstly, there may be a need to develop the sediment graph (i.e., plot the time variation in runoff sediment concentration) associated with a design storm event at the pond inlet. This is required to determine the sediment removal efficiency of a given pond configuration during the specified design storm event. Secondly, the total amount of sediment delivered to the reservoir over the expected life of the reservoir may be estimated. This is required to size the sediment storage volume of an impoundment. 3. RECOMMENDED HYDROLOGIC/SEDIMENTOLOGIC MODEL It is recommended that an existing model be used, rather than designing a new one, because: 1. The development of a new watershed model would be time consuming and therefore, costly. 2. The resulting model would be an untried and untested technique. 3. There is no indication that a new watershed model would be better suited to Alberta conditions than some existing models.
format Other/Unknown Material
author Monenco Consultants Ltd.,
Hydrocon Engineering (Continental) Ltd.
author_facet Monenco Consultants Ltd.,
Hydrocon Engineering (Continental) Ltd.
author_sort Monenco Consultants Ltd.,
title Assessing Design Flows and Sediment Discharge on the Eastern Slopes
title_short Assessing Design Flows and Sediment Discharge on the Eastern Slopes
title_full Assessing Design Flows and Sediment Discharge on the Eastern Slopes
title_fullStr Assessing Design Flows and Sediment Discharge on the Eastern Slopes
title_full_unstemmed Assessing Design Flows and Sediment Discharge on the Eastern Slopes
title_sort assessing design flows and sediment discharge on the eastern slopes
publishDate 1987
url https://doi.org/10.7939/R3RV0D68T
https://era.library.ualberta.ca/items/3bfbf2c4-1662-46dc-b6bd-b3e3f77b85cd
long_lat ENVELOPE(-77.960,-77.960,72.699,72.699)
geographic Pond Inlet
geographic_facet Pond Inlet
genre Pond Inlet
genre_facet Pond Inlet
op_source ERA : Education and Research Archive
op_relation doi:10.7939/R3RV0D68T
10670/1.13h5te
https://era.library.ualberta.ca/items/3bfbf2c4-1662-46dc-b6bd-b3e3f77b85cd
op_doi https://doi.org/10.7939/R3RV0D68T
_version_ 1766173793734098944