Syncrude Lease 17 (Mildred Lake)

Syncrude Canada Limited and the Government of the Province of Alberta are currently negotiating the practicability of proceeding with a synthetic crude oil production project. During the course of analyzing the practicability of the project, the need for an environmental impact assessment was clearl...

Full description

Bibliographic Details
Main Author: Syncrude Canada Ltd.
Format: Other/Unknown Material
Language:English
Published: 1973
Subjects:
Online Access:https://doi.org/10.7939/R38C9R44C
https://era.library.ualberta.ca/items/6822737e-8ee1-4604-a1c1-006d52291be8
id fttriple:oai:gotriple.eu:10670/1.10402/era.39125
record_format openpolar
spelling fttriple:oai:gotriple.eu:10670/1.10402/era.39125 2023-05-15T16:17:39+02:00 Syncrude Lease 17 (Mildred Lake) Syncrude Canada Ltd. 1973-01-01 https://doi.org/10.7939/R38C9R44C https://era.library.ualberta.ca/items/6822737e-8ee1-4604-a1c1-006d52291be8 en eng doi:10.7939/R38C9R44C 10670/1.10402/era.39125 https://era.library.ualberta.ca/items/6822737e-8ee1-4604-a1c1-006d52291be8 ERA : Education and Research Archive envir archi Other https://vocabularies.coar-repositories.org/resource_types/c_1843/ 1973 fttriple https://doi.org/10.7939/R38C9R44C 2023-01-22T17:09:11Z Syncrude Canada Limited and the Government of the Province of Alberta are currently negotiating the practicability of proceeding with a synthetic crude oil production project. During the course of analyzing the practicability of the project, the need for an environmental impact assessment was clearly revealed. Three major time frames - during the planning stage, during construction, and during the commercial operation of the plant - have been accepted as appropriate for reporting environmental impact assessments. This Environmental Impact Assessment has therefore been prepared by Syncrude Canada Limited, for submission to the Department of the Environment prior to the start of construction of its project. The proposed Syncrude commercial operation will be carried out on Lease 17, which lies 20 miles north of the town of Fort McMurray and borders on Lease 86, the site of the only existing tar sands operation. Lease 17 covers 49,788 acres and contains potentially mineable bitumen reserves of approximately 3.5 billion barrels. For mine planning, Lease 17 has been divided into several areas. The site of the initial operation hereafter will be referred to as the initial mining area. It contains enough reserves to feed the proposed plant for approximately 14 years at its approved rate of 80,000 BPD of synthetic products. When the other reserves indicated in Figure 1 are included, the life of this portion of the deposit is about 70 years. Other/Unknown Material Fort McMurray Unknown Canada Fort McMurray Mildred Lake ENVELOPE(-111.588,-111.588,57.053,57.053)
institution Open Polar
collection Unknown
op_collection_id fttriple
language English
topic envir
archi
spellingShingle envir
archi
Syncrude Canada Ltd.
Syncrude Lease 17 (Mildred Lake)
topic_facet envir
archi
description Syncrude Canada Limited and the Government of the Province of Alberta are currently negotiating the practicability of proceeding with a synthetic crude oil production project. During the course of analyzing the practicability of the project, the need for an environmental impact assessment was clearly revealed. Three major time frames - during the planning stage, during construction, and during the commercial operation of the plant - have been accepted as appropriate for reporting environmental impact assessments. This Environmental Impact Assessment has therefore been prepared by Syncrude Canada Limited, for submission to the Department of the Environment prior to the start of construction of its project. The proposed Syncrude commercial operation will be carried out on Lease 17, which lies 20 miles north of the town of Fort McMurray and borders on Lease 86, the site of the only existing tar sands operation. Lease 17 covers 49,788 acres and contains potentially mineable bitumen reserves of approximately 3.5 billion barrels. For mine planning, Lease 17 has been divided into several areas. The site of the initial operation hereafter will be referred to as the initial mining area. It contains enough reserves to feed the proposed plant for approximately 14 years at its approved rate of 80,000 BPD of synthetic products. When the other reserves indicated in Figure 1 are included, the life of this portion of the deposit is about 70 years.
format Other/Unknown Material
author Syncrude Canada Ltd.
author_facet Syncrude Canada Ltd.
author_sort Syncrude Canada Ltd.
title Syncrude Lease 17 (Mildred Lake)
title_short Syncrude Lease 17 (Mildred Lake)
title_full Syncrude Lease 17 (Mildred Lake)
title_fullStr Syncrude Lease 17 (Mildred Lake)
title_full_unstemmed Syncrude Lease 17 (Mildred Lake)
title_sort syncrude lease 17 (mildred lake)
publishDate 1973
url https://doi.org/10.7939/R38C9R44C
https://era.library.ualberta.ca/items/6822737e-8ee1-4604-a1c1-006d52291be8
long_lat ENVELOPE(-111.588,-111.588,57.053,57.053)
geographic Canada
Fort McMurray
Mildred Lake
geographic_facet Canada
Fort McMurray
Mildred Lake
genre Fort McMurray
genre_facet Fort McMurray
op_source ERA : Education and Research Archive
op_relation doi:10.7939/R38C9R44C
10670/1.10402/era.39125
https://era.library.ualberta.ca/items/6822737e-8ee1-4604-a1c1-006d52291be8
op_doi https://doi.org/10.7939/R38C9R44C
_version_ 1766003540900184064