L’achèvement de la Grande Rivière artificielle en Libye :et maintenant, quelle gestion de l’eau ?

This article discusses the evolution of water resource allocation for the Great Man-Made River in Libya, at a time when the main sections of this vast hydraulic development are nearing completion. Against a backdrop of serious water shortages and a dwindling involvement of the State, the evolution o...

Full description

Bibliographic Details
Published in:Méditerranée
Main Author: Palluault, Sébastien
Format: Article in Journal/Newspaper
Language:French
Published: Presses Universitaires de Provence 2012
Subjects:
eau
geo
Online Access:https://doi.org/10.4000/mediterranee.6396
http://journals.openedition.org/mediterranee/6396
id fttriple:oai:gotriple.eu:10.4000/mediterranee.6396
record_format openpolar
spelling fttriple:oai:gotriple.eu:10.4000/mediterranee.6396 2023-05-15T17:05:52+02:00 L’achèvement de la Grande Rivière artificielle en Libye :et maintenant, quelle gestion de l’eau ? The completion of the Great Artificial Leave in Libya: and now, what water management? Palluault, Sébastien 2012-11-30 https://doi.org/10.4000/mediterranee.6396 http://journals.openedition.org/mediterranee/6396 fr fre Presses Universitaires de Provence Méditerranée urn:doi:10.4000/mediterranee.6396 doi:10.4000/mediterranee.6396 http://journals.openedition.org/mediterranee/6396 other Méditerranée eau Libye Grande Rivière artificielle politiques hydrauliques agriculture irriguée water Libya Great Man-Made River hydraulic policies irrigated agriculture geo envir Journal Article https://vocabularies.coar-repositories.org/resource_types/c_6501/ 2012 fttriple https://doi.org/10.4000/mediterranee.6396 2023-01-22T17:40:53Z This article discusses the evolution of water resource allocation for the Great Man-Made River in Libya, at a time when the main sections of this vast hydraulic development are nearing completion. Against a backdrop of serious water shortages and a dwindling involvement of the State, the evolution of water resource allocation underlines the priority given to urban areas and the gradual disappearance of agricultural improvement projects on the arid fringes of the Jeffara Plain. Furthermore, the generalization of private access to water makes supply modes to public areas more complicated. Moreover, arbitration over water supply from the Great Man-Made River between both economic sectors and territories is at the crossroads of institutional overlaps and local and national lobbying. Cet article souligne l’évolution des projets d’allocation des ressources en eaux de la Grande Rivière artificielle libyenne, à l’heure où les principaux tronçons de ce vaste aménagement hydraulique sont en voie d’achèvement. Devant la gravité de la situation hydraulique et dans un contexte de désengagement croissant de l’État, l’évolution des allocations souligne la priorité accordée aux zones urbaines et l’abandon progressif des projets de mise en valeur agricole dans les marges arides de la plaine de la Jeffara. La généralisation de la privatisation des modes d’accès en eau complique, par ailleurs, les modalités d’alimentation dans les périmètres publics. La question des arbitrages entre secteurs et entre territoires pour l’allocation des eaux de la Grande Rivière artificielle se trouve, en outre, au cœur des chevauchements institutionnels et des logiques d’influence entre le national et le local. Article in Journal/Newspaper La Grande Rivière Unknown La Grande Rivière ENVELOPE(-79.000,-79.000,53.834,53.834) Méditerranée 119 9 16
institution Open Polar
collection Unknown
op_collection_id fttriple
language French
topic eau
Libye
Grande Rivière artificielle
politiques hydrauliques
agriculture irriguée
water
Libya
Great Man-Made River
hydraulic policies
irrigated agriculture
geo
envir
spellingShingle eau
Libye
Grande Rivière artificielle
politiques hydrauliques
agriculture irriguée
water
Libya
Great Man-Made River
hydraulic policies
irrigated agriculture
geo
envir
Palluault, Sébastien
L’achèvement de la Grande Rivière artificielle en Libye :et maintenant, quelle gestion de l’eau ?
topic_facet eau
Libye
Grande Rivière artificielle
politiques hydrauliques
agriculture irriguée
water
Libya
Great Man-Made River
hydraulic policies
irrigated agriculture
geo
envir
description This article discusses the evolution of water resource allocation for the Great Man-Made River in Libya, at a time when the main sections of this vast hydraulic development are nearing completion. Against a backdrop of serious water shortages and a dwindling involvement of the State, the evolution of water resource allocation underlines the priority given to urban areas and the gradual disappearance of agricultural improvement projects on the arid fringes of the Jeffara Plain. Furthermore, the generalization of private access to water makes supply modes to public areas more complicated. Moreover, arbitration over water supply from the Great Man-Made River between both economic sectors and territories is at the crossroads of institutional overlaps and local and national lobbying. Cet article souligne l’évolution des projets d’allocation des ressources en eaux de la Grande Rivière artificielle libyenne, à l’heure où les principaux tronçons de ce vaste aménagement hydraulique sont en voie d’achèvement. Devant la gravité de la situation hydraulique et dans un contexte de désengagement croissant de l’État, l’évolution des allocations souligne la priorité accordée aux zones urbaines et l’abandon progressif des projets de mise en valeur agricole dans les marges arides de la plaine de la Jeffara. La généralisation de la privatisation des modes d’accès en eau complique, par ailleurs, les modalités d’alimentation dans les périmètres publics. La question des arbitrages entre secteurs et entre territoires pour l’allocation des eaux de la Grande Rivière artificielle se trouve, en outre, au cœur des chevauchements institutionnels et des logiques d’influence entre le national et le local.
format Article in Journal/Newspaper
author Palluault, Sébastien
author_facet Palluault, Sébastien
author_sort Palluault, Sébastien
title L’achèvement de la Grande Rivière artificielle en Libye :et maintenant, quelle gestion de l’eau ?
title_short L’achèvement de la Grande Rivière artificielle en Libye :et maintenant, quelle gestion de l’eau ?
title_full L’achèvement de la Grande Rivière artificielle en Libye :et maintenant, quelle gestion de l’eau ?
title_fullStr L’achèvement de la Grande Rivière artificielle en Libye :et maintenant, quelle gestion de l’eau ?
title_full_unstemmed L’achèvement de la Grande Rivière artificielle en Libye :et maintenant, quelle gestion de l’eau ?
title_sort l’achèvement de la grande rivière artificielle en libye :et maintenant, quelle gestion de l’eau ?
publisher Presses Universitaires de Provence
publishDate 2012
url https://doi.org/10.4000/mediterranee.6396
http://journals.openedition.org/mediterranee/6396
long_lat ENVELOPE(-79.000,-79.000,53.834,53.834)
geographic La Grande Rivière
geographic_facet La Grande Rivière
genre La Grande Rivière
genre_facet La Grande Rivière
op_source Méditerranée
op_relation urn:doi:10.4000/mediterranee.6396
doi:10.4000/mediterranee.6396
http://journals.openedition.org/mediterranee/6396
op_rights other
op_doi https://doi.org/10.4000/mediterranee.6396
container_title Méditerranée
container_issue 119
container_start_page 9
op_container_end_page 16
_version_ 1766060627543982080